Skip to main content

Rotherham’s Boss Multihog

A Multihog multi-purpose utility vehicle was recently delivered to one northern England-based local authority to help keep its local road network safe and in good condition. TransLinc supplied the Mutihog machine to Rotherham Metropolitan Borough Council (RMBC) under a 10-year partnership contract. The utility vehicle is initially being used for patch planing. Along with the planer attachment the RMBC also ordered winter service attachments in readiness for next winter. Having the hydraulically operated gri
July 20, 2012 Read time: 2 mins

A Multihog multi-purpose utility vehicle was recently delivered to one northern England-based local authority to help keep its local road network safe and in good condition.

TransLinc supplied the 5009 Multihog machine to Rotherham Metropolitan Borough Council (RMBC) under a 10-year partnership contract.

The utility vehicle is initially being used for patch planing. Along with the planer attachment the RMBC also ordered winter service attachments in readiness for next winter. Having the hydraulically operated gritter unit and the heavy-duty lift, tilt and angle snow plough available will enable snow clearing to be carried out should the bad weather return before then.
 
Previous RMBC patch planing operations relied on traditional methods which involved the use of multiple vehicles and manual breaking.

“We had looked for a while for a quicker and more effective way to carry out these types of repairs. Smaller machines were not up to the job and I was of the opinion that there was definitely a gap to be filled in the market,” said David Hepworth, the council’s highways delivery manager.

The Multihog was said to be successfully trialled for two days in real-time repairs. The combination of the powerful base unit and the 400mm wide planer attachment were, according to Multihog, found to be a time saving and efficient method which also eradicated the need for manual breaking.

Planing to a depth of 125mm, the attachment is also said to save the cost of infill materials by accurately removing only what is needed. This also produces a sound base for reinstatement and is said to reduce transport and recycling costs by creating a re-usable material.

“The Multihog machine’s versatility means that we will be using it within a planned scheme of first time fixing of pot holes and for major maintenance scenarios in future,” added Hepworth.

For more information on companies in this article

Related Content

  • Springtime for the use of analytics
    April 6, 2021
    Samu Karanko of Vaisala Digital argues for more - and better - use of big data analytics to predict winter weather patterns in order to keep roads clear of snow and ice
  • Flyover removal completed successfully
    May 14, 2021
    The removal of a flyover in Perry Barr, Birmingham, has now been completed in the UK. The work was carried out successfully by the contractor Tarmac within a tight timeframe
  • Productive milling on Japanese highway
    February 27, 2019
    A large milling machine from Wirtgen has been used to remove the top two asphalt layers of a key route in Japan in the city of Mito, around 140km north-east of Tokyo
  • Powerscreen aids Olympic effort
    April 23, 2013
    Powerscreen distributor Kwintmadi-Lonmadi has been helping local contractors fulfill material requirements in advance of the 2014 Winter Olympics in the Black Sea holiday resort of Sochi. Kwintmadi-Lonmadi was appointed as European Russia distributor in 2011 and in its first year has been awarded the title of Powerscreen Dealer of the Year, 2012. Its first customer to buy a Powerscreen XA400S jaw crusher is heavily involved in the preparations for the Winter Olympic Games, having won various contracts in So