Skip to main content

Portable crushing solution for island road building

July 16, 2019 Read time: 2 mins
On the island of Mayotte, a crushing bucket from MB Crusher is being used to produce road bedding materials

Crushing buckets from 283 MB Crusher have proven useful for road building operations on three islands located in very different parts of the world.

On the island of Rab in Croatia, a unit from MB Crusher has been used to produce road materials for access roads to house construction sites. The crusher bucket was utilised for the task as quarried material would have proven too costly. Instead, the developer opted to use rubble cleared from the site. One of the compact MB-L200 units from the MB Crusher range was fitted to a backhoe loader and used to crush the waste rock from the site clearance operations. This provided crushed rock of a suitable size and quality to be used as road bed material for the access roads to the construction site. With the crushing bucket, the developer was able to produce the material onsite, reducing transport costs in comparison with sourcing material from a quarry elsewhere. In addition, the developer mounted the  crushing bucket on an existing piece of site equipment, further lowering costs.

Similarly on the Mayotte Islands, part of the Comoros archipelago in the Indian Ocean, equipment from MB Crusher proved valuable for producing material. On the island, access to the basalt rock quarries used to produce road materials is restricted. However, road building activities have been assisted by the use of BF135.8 unit from MB Crusher. This 1.6m3 capacity unit is more compact than conventional crushing plant, allowing it to be brought to the quarry site more easily. The quarry is now producing aggregate at a rate of 88m3/hour for local road building work.

And on the islands of Saint-Pierre and Miquelon, two mountainous islands in the Atlantic Ocean, to the South of Newfoundland in Canada, units from MB Crusher are helping with road building activities. In order to build a number of road links it was necessary to make a cutting through a mountain. Restricted space onsite and high transport costs meant that the MB Crusher unit offered advantages. This proved more cost effective than transporting materials from the site for processing. A contractor used an MB-S18 unit to process granite from the extraction heap onsite. The unit has been able to separate soil from the granite, with the latter then being used for road bed material. The unit has been mounted on a 178 Caterpillar 330 excavator for the work, helping cut working costs for the contractor.

For more information on companies in this article

Related Content

  • Simex levers big green gains
    July 7, 2023
    Innovative asphalt recycling and road maintenance solutions from Simex draw on the levers of savings, innovation and environmental sustainability.
  • Rapid adoption of GPS machine control
    February 10, 2012
    The high sophistication of GPS machine control systems has resulted in a fast pace of technological advancement. The three major players in the machine control sector, Leica Geosystems, Topcon and Trimble have all made major gains in recent years. The sophistication of the latest systems can combine satellite position data from the GPS and GLONASS networks with information from total stations to provide precise, high speed machine operation. Further more the firms have also prepared themselves for the intro
  • Significant wins for Signify
    April 19, 2021
    Signify is transforming Gran Canaria’s most important highway, known as GC-1, into a smart highway with the company’s Interact City system
  • Wirtgen Group machines delivering new runway for German airbase
    October 26, 2016
    Machines from the Wirtgen Group are carrying out an important reconstruction job for the surface course at Büchel Air Base. Road machinery from Hamm, Vögele and Wirtgen as well as asphalt plants from Benninghoven have been carrying out the work, delivering a new runway within a tight timeframe. To achieve this, the work had to be planned well in advance, with the contractors organising the logistics and their personnel accordingly.