Skip to main content

Portable crushing solution for island road building

July 16, 2019 Read time: 2 mins
On the island of Mayotte, a crushing bucket from MB Crusher is being used to produce road bedding materials

Crushing buckets from 283 MB Crusher have proven useful for road building operations on three islands located in very different parts of the world.

On the island of Rab in Croatia, a unit from MB Crusher has been used to produce road materials for access roads to house construction sites. The crusher bucket was utilised for the task as quarried material would have proven too costly. Instead, the developer opted to use rubble cleared from the site. One of the compact MB-L200 units from the MB Crusher range was fitted to a backhoe loader and used to crush the waste rock from the site clearance operations. This provided crushed rock of a suitable size and quality to be used as road bed material for the access roads to the construction site. With the crushing bucket, the developer was able to produce the material onsite, reducing transport costs in comparison with sourcing material from a quarry elsewhere. In addition, the developer mounted the  crushing bucket on an existing piece of site equipment, further lowering costs.

Similarly on the Mayotte Islands, part of the Comoros archipelago in the Indian Ocean, equipment from MB Crusher proved valuable for producing material. On the island, access to the basalt rock quarries used to produce road materials is restricted. However, road building activities have been assisted by the use of BF135.8 unit from MB Crusher. This 1.6m3 capacity unit is more compact than conventional crushing plant, allowing it to be brought to the quarry site more easily. The quarry is now producing aggregate at a rate of 88m3/hour for local road building work.

And on the islands of Saint-Pierre and Miquelon, two mountainous islands in the Atlantic Ocean, to the South of Newfoundland in Canada, units from MB Crusher are helping with road building activities. In order to build a number of road links it was necessary to make a cutting through a mountain. Restricted space onsite and high transport costs meant that the MB Crusher unit offered advantages. This proved more cost effective than transporting materials from the site for processing. A contractor used an MB-S18 unit to process granite from the extraction heap onsite. The unit has been able to separate soil from the granite, with the latter then being used for road bed material. The unit has been mounted on a 178 Caterpillar 330 excavator for the work, helping cut working costs for the contractor.

For more information on companies in this article

Related Content

  • High quality Swedish stone
    February 10, 2012
    Close to Sweden's second largest city Göthenburg lies the efficient Jehander quarrying operation run by Heidelberg Cement. The site produces around 9,000tonnes/day at peak seasonal demand and has an output of some 1,000,000tonnes/year. The site has recently renewed its operating permission and now has the necessary approval to work until 2021.
  • Improved airport for Thimarafushi atoll
    August 29, 2014
    Thimarafushi forms part of the Thaa Atoll lying in the Indian Ocean but access has been limited in the past. However the construction of a new airport planned by the Maldives Government will help develop the tourist trade, boosting the local economy. Most visitors previously used the country’s two international airports, using these as hubs for flights to the country’s six domestic airports. This has limited travel to only a few of the country’s 1,192 islands, of which around 200 are inhabited. As a result,
  • Chinese manufacturers competing in quarrying segment
    March 5, 2015
    Chinese firms are now gearing up to tackle the quarrying market - Mike Woof writes. One of the key developments of note for the bauma China exhibition in late 2014 was the number of Chinese manufacturers now looking to compete in the quarrying sector. Also of note was how Western manufacturers are also taking the emergent markets seriously, developing machines to counter this increased competition from China. In many cases Western manufacturers have partnered with Chinese firms, bought out Chinese companies
  • Desert quarry supplies major road projects
    February 10, 2012
    Egyptian contractor Orascom has set up a new quarry site in the country's desert area, close to the city of Assuit. The quarry was opened specifically to supply Orascom's major road construction projects in this area of Egypt, with high quality aggregates.