Skip to main content

Norwegian quarry opts for the Hitachi ZW310-5 wheel loader

Norwegian producer of high-quality aggregates Hamar Pukk og Grus has invested in a new ZW310-5 for loading trucks and trailers at its 60-hectare quarry on the outskirts of the town of Hamar. The wheeled loader is the first Hitachi machine in the company’s fleet and was delivered in April 2015 by the Norwegian dealer Nasta. It has joined a team of six personnel on the site, who are responsible for excavating 120,000m³ of materials and producing 250,000 tonnes of aggregates a year. Material is loaded in
March 21, 2016 Read time: 2 mins
Hitachi ZW310-5 wheeled loader
Norwegian producer of high-quality aggregates Hamar Pukk og Grus has invested in a new ZW310-5 for loading trucks and trailers at its 60-hectare quarry on the outskirts of the town of Hamar.

The wheeled loader is the first 233 Hitachi machine in the company’s fleet and was delivered in April 2015 by the Norwegian dealer Nasta. It has joined a team of six personnel on the site, who are responsible for excavating 120,000m³ of materials and producing 250,000 tonnes of aggregates a year.

Material is loaded into a primary crusher to remove the sand that is then used for the production of concrete. A secondary crusher removes some of the larger stones which are sold as 20/120 for road and general construction site use. The remaining material goes through a third crusher to produce 0/4, 4/8, 8/11, 11/16 and 16/22 aggregates, which are used for roads, concrete, foundations and drainage work.

“We were able to test a larger model, the ZW330-5, beforehand thanks to Nasta and this helped us to make our decision,” said Rune Lund, general manager at Hamar Pukk og Grus.

“It has a high capacity for the loading process and it is especially effective at driving into the stockpiles,” said Technician Tore Bergrud, who has been working on the site for 27 years and driving wheeled loaders since 2005. “It is also easy to manoeuvre and very smooth for turning on full lock in a tight space. The Hitachi is also advantageous for load-and-carry operations and travels relatively quickly uphill compared to other larger machines.”

For more information on companies in this article

Related Content

  • Sandvik machines help improve quarry output in Thailand
    June 6, 2016
    The Prachuap Khiri Khan region of Thailand is well known for producing high quality aggregates, with four quarries and six concrete plants in operation. A key producer is Tabsakae Granite, which now operates a complete mobile crushing and screening plant. The Sandvik Construction QJ341 jaw crusher, QH331 Hydrocone crusher and a QA451 triple deck Doublescreen are now delivering high production of quality aggregates. Tabsakae Granite operates a quarry and a concrete plant in the Prachuap Khiri Khan region
  • Why Hitachi rental electric excavators are a perfect fit
    July 1, 2025
    When Jurgen van Uijthoven needed an electric excavator for a short-term project, he knew exactly who to ask. The long-standing customer of Hitachi Construction Machinery sub-dealer Pellen BV found an ideal solution to win the tender and complete the work.
  • Sandvik aids Hamilton Aggregates for success
    April 11, 2013
    Established by former quarry planner Edward Hamilton and his wife, Genia, Hamilton Aggregates in the US state of Arkansas has grown from a single 0.202 hectare quarry to a three quarry operation in just seven years. The firm’s Bonds quarry in Clinton had an initial plant consisting of an Extec (now Sandvik) C12+ mobile jaw crusher and an E7 mobile scalper, which were rented from Brian Costello from Crushing Tigers; the local distributor of Sandvik mobile crushers and screeners. Showing sound business sense,
  • The use of telematics in construction machines is growing
    May 20, 2015
    Demand for telematics technology is growing, as equipment users begin to lean the value of these systems – Alan Dron reports With construction projects increasingly operating to wafer-thin profit margins, any technological assistance that can keep the accounts in the black is welcome. This is particularly the case with those projects where contractors can share a larger slice of the profits if they complete their work ahead of schedule. The downside, of course, is that they also share the pain if the