Skip to main content

New telehandler platform from JCB

A new development from JCB is an access platform attachment for use with the firm’s 535-140 and 535-128 model telehandlers. This has been developed to meet growing market demand for access platform attachments that can be used on telehandlers in a range of construction duties. Designed for use in finishing work or tunnel construction for example, the platform is offered in three versions with the basic fixed unit, an extending model and one that both slews and extends. The basic fixed unit measures 1.5x2.5m
June 15, 2012 Read time: 2 mins
A new development from 255 JCB is an access platform attachment for use with the firm’s 535-140 and 535-128 model telehandlers.

This has been developed to meet growing market demand for access platform attachments that can be used on telehandlers in a range of construction duties. Designed for use in finishing work or tunnel construction for example, the platform is offered in three versions with the basic fixed unit, an extending model and one that both slews and extends. The basic fixed unit measures 1.5x2.5m, while the extending model is 1.2m wide and offers extension from 2.5-5m. The top-of-the-line version offers a 400kg capacity, 180° of slew as well as being 1.2m wide and extending from 2.5-5m. Fitted to the 535-140 telehandler the platforms provide working heights of up to 15.6m. Safety features are fitted such as a single key interlock, an interlock on the boom, hose burst protection and rear axle stabilisation for the telehandler.

For more information on companies in this article

Related Content

  • Bridge design using flow modelling techniques
    February 17, 2012
    SBG has set numerous engineering precedents with its hugely innovative Jamarat Bridge project in Saudi Arabia
  • Carlson developing paver range
    October 9, 2015
    US firm Carlson is best known for its screeds, which are used by a wide range of paver manufacturers in the US. However Carlson, part of the Astec Group, is also a manufacturer of asphalt pavers. The firm recently broadened its line up with the addition of another compact paver model, the CP75. This new model shares a number of features with the existing CP100 from Carlson.
  • Well structured maintenance
    January 4, 2013
    Major bridge maintenance and replacement projects across the world are extending the life of many impressive historic landmarks as Guy Woodford reports The Tamar Bridge, part of the main A38 trunk road linking Saltash in Cornwall with Plymouth in Devon, south west England, marked its 50th anniversary with a steel deck resurfacing project involving Stirling Lloyd's Eliminator bridge deck waterproofing system. Jointly owned by Plymouth City Council and Cornwall Council, the Tamar has a suspended length of 642
  • Cost-saving benefits of dual layer asphalt paving
    February 14, 2012
    Sophisticated dual layer paving technologies currently on the market are said to offer major advantages to road builders. Roads built using twin layer, hot on hot paving techniques can last considerably longer than those constructed using conventional methods. Contractors and clients also stand to gain from savings on materials costs, through the elimination of the need for emulsion spraying between binder and wearing courses and with the use of thin layer wearing course designs. At present two paver man