Skip to main content

New Holland's motorway deployment

A fleet of compact and zero tailswing New Holland excavators has been deployed to assist with motorway crash barrier replacement work.
February 6, 2012 Read time: 2 mins
A New Holland E235B reduced tailswing tracked excavator at work on the motorway
A fleet of compact and zero tailswing 5895 New Holland excavators has been deployed to assist with motorway crash barrier replacement work.

The work is on one of the busiest sections of the M62 in County Yorkshire, northern England, and local civil engineering contractor 1147 K Rouse has deployed eight reduced tailswing tracked machines (four E235Bs and four E135Bs) as well two compact radius MH City wheeled excavators between junctions 27 and 28, south of the city of Leeds. The machines are being used to install new drainage prior to the replacement of the existing steel fences with the now mandatory concrete barriers.

With only one lane of each side of the motorway closed during the work, the space to operate in is limited.

While the E235B tracked machines are used in the central reservation itself as primary earthmovers to excavate the drainage channels, and their smaller E135B cousins work predominantly on backfilling, the MH City machines are used to transport and install materials on site. As a result, they frequently work in the closed lane of the motorway.

"Their great advantage in such a confined area is that they are virtually zero tailswing, which is obviously a very important safety feature in this line of work," said Jim McGibbon, the company's plant manager.

It was this combination of safety and productivity that initially persuaded main contractor 1146 Balfour Beatty to employ K Rouse on the job. "They became aware of it through cross hire, and saw a distinct advantage of using the City machines along with other compact radius models," said McGibbon.

Now the company has been awarded the contract for similar work between junctions 29 and 30 of the M62 which is due to start shortly.

For more information on companies in this article

Related Content

  • Highways England: new agency with long-term investment strategies
    August 18, 2015
    Highways England, created out of the old Highways Agency, was set up on April 1 to oversee a closer relationship between government client and private contractors. World Highways went to a recent forum in London to hear both sides declare their hopes and challenges. Government reforms are often met with a certain amount of scepticism thanks to years of disillusionment over forgotten ministerial promises. Given that, highway contractors in the UK could have been forgiven if they had raised their eyes skyward
  • New concrete barrier on key M5 motorway section
    October 30, 2012
    Contractor Tarmac has carried out major works on the UK’s M5 motorway after recycling around 30,000tonnes of concrete and providing 8,000m3 of new concrete for new slip-form central barrier works. The project, between Junctions 3 and 4a of the M5, was delivered as part of an eight-week scheme to install 13km of new concrete safety barrier. Approximately 30,000 tonnes of concrete were excavated and then crushed into Type 1 and 6F5 aggregates at Tarmac’s recycling site in Ettingshall, Wolverhampton. Over 14,0
  • Asphalt milling and paving with 3D control
    February 16, 2012
    Milling and paving repair operations for airport runways require particularly high tolerances, an obvious market for 3D control solutions writes Mike Woof. Airport runways require some of the most accurate quality standards and tightest tolerances of any asphalt or concrete surface. This is one area where the high precision capabilities of 3D systems offer clear advantages.
  • Balfour Beatty wins Lower Thames deal
    January 24, 2023
    The Lower Thames Crossing will run under the River Thames, down river from London in the south-east of England.