Skip to main content

New Holland's motorway deployment

A fleet of compact and zero tailswing New Holland excavators has been deployed to assist with motorway crash barrier replacement work.
February 6, 2012 Read time: 2 mins
A New Holland E235B reduced tailswing tracked excavator at work on the motorway
A fleet of compact and zero tailswing 5895 New Holland excavators has been deployed to assist with motorway crash barrier replacement work.

The work is on one of the busiest sections of the M62 in County Yorkshire, northern England, and local civil engineering contractor 1147 K Rouse has deployed eight reduced tailswing tracked machines (four E235Bs and four E135Bs) as well two compact radius MH City wheeled excavators between junctions 27 and 28, south of the city of Leeds. The machines are being used to install new drainage prior to the replacement of the existing steel fences with the now mandatory concrete barriers.

With only one lane of each side of the motorway closed during the work, the space to operate in is limited.

While the E235B tracked machines are used in the central reservation itself as primary earthmovers to excavate the drainage channels, and their smaller E135B cousins work predominantly on backfilling, the MH City machines are used to transport and install materials on site. As a result, they frequently work in the closed lane of the motorway.

"Their great advantage in such a confined area is that they are virtually zero tailswing, which is obviously a very important safety feature in this line of work," said Jim McGibbon, the company's plant manager.

It was this combination of safety and productivity that initially persuaded main contractor 1146 Balfour Beatty to employ K Rouse on the job. "They became aware of it through cross hire, and saw a distinct advantage of using the City machines along with other compact radius models," said McGibbon.

Now the company has been awarded the contract for similar work between junctions 29 and 30 of the M62 which is due to start shortly.

For more information on companies in this article

Related Content

  • Australian bridge slides into position
    July 18, 2012
    A heavy rail crossing as part of Australia's EastLink motorway demanded great ingenuity and careful planning Most of the 88 bridges on the EastLink tolled motorway in, Melbourne, Australia were kept as simple and straightforward as possible. Contractor Thiess John Holland (TJH) developed its own precast yard 150km from the city, which provided many of the prefabricated materials required for the structures. This offered speed and economy while logistics and sequencing were vital for their erection. But the
  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • M27 gets ESS bases from Marshalls Civils
    August 30, 2021
    Precast bases for electronic signalling systems help convert the UK's M27 into a smart motorway.
  • Auckland Harbour bridge celebrates 50 years
    April 5, 2012
    The bridge over Auckland Harbour celebrates its half century this year, and it has been given a major upgrade to ensure that safety is maintained in New Zealand's largest city. Mary Searle reports. Auckland is New Zealand's largest city, home to nearly a third of the entire country's population. It's a sprawling metropolis, and its 1.3 million people are spread over 637km² of city, suburbs and islands. The Auckland Harbour Bridge, which celebrates its 50th birthday in May, is a vital link in the city's road