Skip to main content

MB drum cutter unit for demolition project in Mexico

February 6, 2018 Read time: 2 mins
A drum cutter from MB Crusher played a key role in a Mexico City demolition job

A structure in Mexico City, Mexico’s busy capital, has been demolished with assistance from a 283 MB Crusher units, The MB-R800 drum cutter was operated by Pilotec, a Mexican contractor commissioned to do the work.

Part of an old factory was demolished. Then the basement of the new building was excavated and diaphragm walls were built to prevent the earth next to the excavated area from collapsing, using Real effective supports for the perimeter structures. These are usually used to protect areas excavated to accommodate underground floors, or as a support of bridge foundations or on the building sites for jetties and docks, as well as for the construction of deep wells.

After completing the diaphragm walls, Pilotec was left with a problem: how to eliminate all the excess material left on the wall, inert material that made it shapeless and occupied space. At this point the MB-R800 drum cutter was used. Mounted on a 20tonne 2294 Cat excavator, the drum cutter removed the excess part of the wall in as little as two weeks. So it was not necessary to construct a revetment wall, as is often the case in such worksites. No further costs were incurred.

The MB Crusher drum cutter also brought advantages in terms of productivity, safety and lower maintenance time. MB drum cutters are equipped with an integrated safety system which triggers if the excavator settings are not properly regulated.

For more information on companies in this article

Related Content

  • Bridging the gap in African infrastructure
    December 20, 2013
    Leading formwork manufacturers have secured some impressive contracts in Africa, as the continent’s transport infrastructure continues to improve at a rapid pace. Meanwhile, other bridgework equipment companies are also seeing their products in demand in Africa, as well as North America and Australia.
  • Peri formwork for Danish port link tunnel project
    November 29, 2013
    The Nordhavnsvej – Vej- og Tunnelentreprise (Nordhavnsvej) project is Copenhagen’s largest infrastructure project in the last 50 years. The 1.65km-long route will eventually link the Danish capital’s northern port area with the Helsingør motorway. It runs through a very densely built urban area, in parts at depths of up to 22m. One particular challenge regarding the execution was planning the course of the tunnel because the underground structure also crosses a very busy railway line.
  • Road rehabilitation with a recycling train in Portugal
    February 18, 2022
    A road rehabilitation job in Portugal has been carried out using the latest cold recycling train technology
  • CIFA’s concrete coastal protection
    August 19, 2015
    Machines from CIFA are playing an important role in providing protection during a port expansion job. There is a considerable need for additional sea protection during a major port expansion project in Italy. The port of Civitavecchia is being expanded as part of a programme to boost its capacity and capabilities and develop the facility both for its commercial and tourist operations. However, the work comes with considerable need to improve the protection from the sea, so as to ensure that its roadways