Skip to main content

MB drum cutter unit for demolition project in Mexico

February 6, 2018 Read time: 2 mins
A drum cutter from MB Crusher played a key role in a Mexico City demolition job

A structure in Mexico City, Mexico’s busy capital, has been demolished with assistance from a 283 MB Crusher units, The MB-R800 drum cutter was operated by Pilotec, a Mexican contractor commissioned to do the work.

Part of an old factory was demolished. Then the basement of the new building was excavated and diaphragm walls were built to prevent the earth next to the excavated area from collapsing, using Real effective supports for the perimeter structures. These are usually used to protect areas excavated to accommodate underground floors, or as a support of bridge foundations or on the building sites for jetties and docks, as well as for the construction of deep wells.

After completing the diaphragm walls, Pilotec was left with a problem: how to eliminate all the excess material left on the wall, inert material that made it shapeless and occupied space. At this point the MB-R800 drum cutter was used. Mounted on a 20tonne 2294 Cat excavator, the drum cutter removed the excess part of the wall in as little as two weeks. So it was not necessary to construct a revetment wall, as is often the case in such worksites. No further costs were incurred.

The MB Crusher drum cutter also brought advantages in terms of productivity, safety and lower maintenance time. MB drum cutters are equipped with an integrated safety system which triggers if the excavator settings are not properly regulated.

For more information on companies in this article

Related Content

  • Mexican president speaks at PIARC World Road Congress
    April 30, 2012
    Mexican president Felipe Calderon spoke at the opening of the 2011 PIARC World Road Congress in capital Mexico City. Calderon highlighted key issues such as his country's major investment in infrastructure, a move designed to boost mobility and the country's economy.
  • Italian viaduct job for Conjet
    July 4, 2012
    The multi-span reinforced concrete viaduct at Torano, about 100km east of the Italian capital Rome, is a major structure on the main E80/A24/A25 Autostrada crossing central Italy. The Viadotto Fiume Salto was opened in the late 1960s, but the use of de-icing salts during winter months has since caused considerable calcium chloride damage to the structure forcing the Italian Highways Authority and the Autostrada di Parchi's owner Toto to carry out extensive repairs. The renovation estimated at around €5 mill
  • 'Soft' option gets results
    February 8, 2012
    Soft engineering techniques, used to prevent soil erosion and stabilise steep cuts and embankments, have allowed engineers to successfully widen the M1 motorway in the UK. Over the 50km length of the work (25km northbound, 25km southbound) on a busy section of the motorway near the city of Nottingham, a total of 48km of slopes had to be modified, split roughly between cutting and embankment. The UK Highways Agency requirements for the work meant that wholesale widening of the corridor was not possible: the
  • Building Egypt's world class Desert Highway
    May 3, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong