Skip to main content

MB drum cutter unit for demolition project in Mexico

February 6, 2018 Read time: 2 mins
A drum cutter from MB Crusher played a key role in a Mexico City demolition job

A structure in Mexico City, Mexico’s busy capital, has been demolished with assistance from a 283 MB Crusher units, The MB-R800 drum cutter was operated by Pilotec, a Mexican contractor commissioned to do the work.

Part of an old factory was demolished. Then the basement of the new building was excavated and diaphragm walls were built to prevent the earth next to the excavated area from collapsing, using Real effective supports for the perimeter structures. These are usually used to protect areas excavated to accommodate underground floors, or as a support of bridge foundations or on the building sites for jetties and docks, as well as for the construction of deep wells.

After completing the diaphragm walls, Pilotec was left with a problem: how to eliminate all the excess material left on the wall, inert material that made it shapeless and occupied space. At this point the MB-R800 drum cutter was used. Mounted on a 20tonne 2294 Cat excavator, the drum cutter removed the excess part of the wall in as little as two weeks. So it was not necessary to construct a revetment wall, as is often the case in such worksites. No further costs were incurred.

The MB Crusher drum cutter also brought advantages in terms of productivity, safety and lower maintenance time. MB drum cutters are equipped with an integrated safety system which triggers if the excavator settings are not properly regulated.

For more information on companies in this article

Related Content

  • KIT to study bridge vibration data
    July 7, 2025
    In Germany, the Karlsruhe Institute of Technology, KIT, will use acceleration sensors to gather vibration data from bridges to pinpoint structural degradation.
  • Building a replacement bridge in record time
    March 13, 2023
    The construction of a new bridge in Pittsburgh, Pennsylvania to replace a collapsed structure has been carried out in record time
  • Dowel bar drilling selection poses challenges
    January 11, 2013
    Pneumatic concrete dowel drills have one purpose – to drill holes. While their intended use is easy to recognize, operation of this equipment isn’t quite so simple. In fact, it’s a bit of a science. That’s not to say they’re difficult to operate. But there are certain best practices and processes to keep in mind for proper drill operation, whether it’s an on-grade, slab-rider or equipment-mounted model. Operators who adopt these guidelines and implement them on every job are rewarded with better performance
  • Ground penetrating radar used to investigate tunnel deterioration
    May 13, 2015
    Using ground penetrating radar to determine reason for serious pavement settling in Kentucky-Tennessee tunnel Just a few years after the opening of the Cumberland Gap Tunnel, highway officials noticed moderate to severe settling of the continuously reinforced concrete pavement. The mountain tunnel provides an important link between Kentucky and Tennessee along US25E and the problem looked serious, with many voids discovered beneath the pavement surface. To investigate the problems, the Kentucky Transpor