Skip to main content

MB drum cutter unit for demolition project in Mexico

February 6, 2018 Read time: 2 mins
A drum cutter from MB Crusher played a key role in a Mexico City demolition job

A structure in Mexico City, Mexico’s busy capital, has been demolished with assistance from a 283 MB Crusher units, The MB-R800 drum cutter was operated by Pilotec, a Mexican contractor commissioned to do the work.

Part of an old factory was demolished. Then the basement of the new building was excavated and diaphragm walls were built to prevent the earth next to the excavated area from collapsing, using Real effective supports for the perimeter structures. These are usually used to protect areas excavated to accommodate underground floors, or as a support of bridge foundations or on the building sites for jetties and docks, as well as for the construction of deep wells.

After completing the diaphragm walls, Pilotec was left with a problem: how to eliminate all the excess material left on the wall, inert material that made it shapeless and occupied space. At this point the MB-R800 drum cutter was used. Mounted on a 20tonne 2294 Cat excavator, the drum cutter removed the excess part of the wall in as little as two weeks. So it was not necessary to construct a revetment wall, as is often the case in such worksites. No further costs were incurred.

The MB Crusher drum cutter also brought advantages in terms of productivity, safety and lower maintenance time. MB drum cutters are equipped with an integrated safety system which triggers if the excavator settings are not properly regulated.

For more information on companies in this article

Related Content

  • Out of sight
    July 16, 2012
    With traffic volumes increasing around the world, many existing road links will need to be upgraded or replaced in coming years The need for new road tunnels is particularly intense in many dense urban areas, due to environmental requirements that mean new road links will have to be installed underground. However, improving existing road tunnel links is providing a very large part of the business for this specialised construction segment at present.
  • State of the art tunnel a conservation triumph
    May 2, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • State of the art tunnel a conservation triumph
    February 28, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • Brisbane’s new airport link is an engineering success
    April 12, 2013
    Financial troubles for Brisbane's new Airport Link overshadow its construction success – Adrian Greeman writes. Political argument and legal dispute is likely to rage for some time yet over the bankruptcy of Australian road operator BrisConnect, which went into receivership this February with A$3 billion in debt. Toll paying users for its new Airport Link have been less than half the predicted numbers since it opened in July last summer. But if its nancial engineering is being questioned, the same is not t