Skip to main content

MB drum cutter unit for demolition project in Mexico

February 6, 2018 Read time: 2 mins
A drum cutter from MB Crusher played a key role in a Mexico City demolition job

A structure in Mexico City, Mexico’s busy capital, has been demolished with assistance from a 283 MB Crusher units, The MB-R800 drum cutter was operated by Pilotec, a Mexican contractor commissioned to do the work.

Part of an old factory was demolished. Then the basement of the new building was excavated and diaphragm walls were built to prevent the earth next to the excavated area from collapsing, using Real effective supports for the perimeter structures. These are usually used to protect areas excavated to accommodate underground floors, or as a support of bridge foundations or on the building sites for jetties and docks, as well as for the construction of deep wells.

After completing the diaphragm walls, Pilotec was left with a problem: how to eliminate all the excess material left on the wall, inert material that made it shapeless and occupied space. At this point the MB-R800 drum cutter was used. Mounted on a 20tonne 2294 Cat excavator, the drum cutter removed the excess part of the wall in as little as two weeks. So it was not necessary to construct a revetment wall, as is often the case in such worksites. No further costs were incurred.

The MB Crusher drum cutter also brought advantages in terms of productivity, safety and lower maintenance time. MB drum cutters are equipped with an integrated safety system which triggers if the excavator settings are not properly regulated.

For more information on companies in this article

Related Content

  • Norway’s massive Rogfast Tunnel project
    December 11, 2018
    The world's longest and deepest road tunnel is underway in western Norway - Adrian Greeman reports
  • Traffic control to beat congestion
    November 6, 2012
    Max Lay discusses how congestion has posed problems throughout history from early civilisation to the present day One of the earliest known human settlements was at the Springs of Elisha at Jericho. Inevitably, locals collecting fresh water from the springs would encounter other water carriers. When a path was too narrow, or access to it was too limited, or it crossed another path, some carriers would find it necessary to stand aside for others. Priority in such cases might be based on common courtesy and p
  • World growth in geosynthtics set to rise
    February 17, 2012
    With geosynthetics sales set to grow rapidly in the next three years, manufacturers are preparing for the demand. Patrick Smith reports. Global demand for geosynthetics is projected to increase 5.3% annually to 4.7 billion m² in 2013 with countries such as China, India and Russia expected to post the strongest gains through the forecast period. All are building large-scale infrastructure developments and face evolving environmental protection regulations and strict building construction codes.
  • Machine control technology round table discussion with Leica Geosystems, Topcon and Trimble
    January 4, 2022
    In this, the first in a series of top-level roundtable discussions led by World Highways, editor Mike Woof and editorial director Geoff Hadwick talk machine control technology with three world-class experts from Leica Geosystems, part of Hexagon, Topcon and Trimble. Find out what these key opinion leaders are thinking on six vitally important topics. Let them help you stay ahead of the game.