Skip to main content

An Italian job for Hitachi ZX350LCN-6 medium excavators

If you’re working in a tough quarry, you need machinery that doesn’t break down. That’s the opinion of Basalto La Spicca’s Quarry Manager Luca Dominici. A basalt quarry in southern Umbria, owned by Basalto La Spicca, demands the most durable equipment - in this case, two Hitachi ZX350LCN-6 medium excavators. These will eventually replace its older Zaxis-3 models, said quarry manager Luca Dominici. To enhance stability on the quarry floor, the new machines are equipped with double grouser shoes. They’re al
May 1, 2018 Read time: 2 mins
If you’re working in a tough quarry, you need machinery that doesn’t break down. That’s the opinion of Basalto La Spicca’s Quarry Manager Luca Dominici.


A basalt quarry in southern Umbria, owned by Basalto La Spicca, demands the most durable equipment - in this case, two 233 Hitachi ZX350LCN-6 medium excavators. These will eventually replace its older Zaxis-3 models, said quarry manager Luca Dominici. To enhance stability on the quarry floor, the new machines are equipped with double grouser shoes. They’re also fitted with 1.8m3 rock buckets, while one of the ZX350LCN-6s is using a hammer attachment.

According to Luca, the new Zaxis-6 excavators are making a positive impact:

“Our machines don’t break down. We had no problems with the ZX350LC-3 after 12,000 working hours and so the new models promise to be even better,” said Dominici.

The Zaxis-6 models use around 30% less fuel per hour than the Zaxis-3.

The engine power rating of the ZX350LCN-6 is 210kW. Its operating weight is between 34,200-36,300kg and it has a digging depth between 6,500-7,380mm.

The medium excavators join Basalto La Spicca’s fleet of Hitachi machinery, which includes two large excavators - a ZX520LCH-3 and ZX470LCH-3 - and two ZW250-5 wheeled loaders.

For more information on companies in this article

Related Content

  • Boosting output at a Czech quarry
    March 24, 2021
    The addition of a Doosan DX300LC-5 excavator to an existing quarry operation has helped boost production by 20-30%. The new machine is now working at the Mítov quarry in the Czech Republic.
  • Long hours in Yorkshire, UK, for Doosan’s latest machines
    August 21, 2015
    Heavy-duty quarry work is the order of the day for new Doosan DX420LC-3 and DX340LC-3 crawler excavators, together with two new DL550-3 and three new DL420-3 wheel loaders. Wentvalley Aggregates & Recycling in county Yorkshire in the UK purchased the machines for its Wentbridge site where they work alongside other generation machines, the Doosan DL450 wheel loader and Doosan DX225LC excavator. The quarry supplies limestone products, including single-size and all primary blended products from crusher runs
  • Chicago Pneumatic scores breaker supply deal in Qatar
    December 15, 2017
    Chicago Pneumatic has supplied a major order of hydraulic breakers to Rock Fall Contracting WLL (RFC), a key civil engineering and earthmoving specialist based in Doha, Qatar. The firm has augmented its fleet of Chicago Pneumatic rig-mounted hydraulic breakers with the addition of new RX8 and RX54 units. The breakers are destined for use in demanding applications within the programme of infrastructure projects for Qatar’s hosting of the IAAF World Athletics Championship in 2019 and the World Cup in 2022.
  • Get ready for winter road maintenance
    October 3, 2016
    The winter maintenance market heats up this summer. Bobcat has expanded its winter range of loaders with the addition of the S450 skid-steer and T450 compact tracked machines.