Skip to main content

Instarmac’s Flowpoint fills in the spaces at Juuliku junction

UltraScape Flowpoint has been used at three new roundabouts as part of the €11 million Juuliku junction and section upgrade near Tallinn. The 9km project involved reconstructing areas of the road network as well as introducing a new 3.4km section of road, two bridges and viaducts and a two-level interchange. An additional three roundabouts were built with natural stone to assist with the flow of cars and trucks. Maanteeamet (the Estonian Road Administration) required a grout that would be durable and cou
February 8, 2018 Read time: 2 mins
UltraScape Flowpoint has been used at three new roundabouts as part of the €11 million Juuliku junction and section upgrade near Tallinn


The 9km project involved reconstructing areas of the road network as well as introducing a new 3.4km section of road, two bridges and viaducts and a two-level interchange. An additional three roundabouts were built with natural stone to assist with the flow of cars and trucks. Maanteeamet (the 2666 Estonian Road Administration) required a grout that would be durable and could withstand extreme temperatures, from freezing winters to warm summers.

Contraactors used Flowpoint rapid set flowable grout to point stone setts. Flowpoint is part of the UltraScape Mortar Paving System and as such it has been independently tested to British Standard 7533. Development and testing took place over number of years to ensure a durable finish which will not crack or stain, according to the manufacturer.

Flowpoint’s fluid consistency allows for large areas of paving to be grouted quickly. The flowable nature of the product means it is equally suited to grouting small cobbles on a driveway as it is large paving tiles in urban regeneration projects. This also makes it the ideal product for grouting uneven areas - essential for the Estonian project.

Importantly, Flowpoint can receive foot traffic in one hour and vehicular traffic in four hours. This keeps disruption to motorists and pedestrians to a minimum and allows contractors to move on to their next project quickly.

UltraScape's Mortar Paving System has also been used at Estonia’s Tallinn Old Town project, the Opera House in Dubai, Roxy Cinema in New Zealand and, in the UK, at MediaCity in Salford, the Savoy Hotel in London and the Bullring shopping centre in Birmingham.

For more information on companies in this article

Related Content

  • Get ready for winter road maintenance
    October 3, 2016
    The winter maintenance market heats up this summer. Bobcat has expanded its winter range of loaders with the addition of the S450 skid-steer and T450 compact tracked machines.
  • Stafford road project underway
    July 8, 2025
    Work is underway in the UK for a key Stafford road project.
  • Turkmenistan’s new bridge features novel waterproofing
    November 8, 2017
    Turkmenistan’s new bridge is benefiting from a novel sealing system that will optimise working life as well as maximising safety. A novel waterproofing solution is being utilised for the Turkmenabat - Farap Bridge in Turkmenistan. The project is of note as the structure is the longest metal span bridge in Central Asia. The client for the project is the state-owned firm Turkmenavtohowayollary, while the general contractor is Altcom Road Construction and the consultant engineer is Soyuztransproekt. Stirling
  • Pūhoi-to-Warkworth motorway project
    September 25, 2020
    After a hiatus because of the COVID-19 lockdown, work has restarted on what will be one of New Zealand’s most visually impressive motorways. Andrew Thackwray, senior manager for project delivery for Waka Kotahi, the New Zealand Transport Agency, explains