Skip to main content

Instarmac’s Flowpoint fills in the spaces at Juuliku junction

UltraScape Flowpoint has been used at three new roundabouts as part of the €11 million Juuliku junction and section upgrade near Tallinn. The 9km project involved reconstructing areas of the road network as well as introducing a new 3.4km section of road, two bridges and viaducts and a two-level interchange. An additional three roundabouts were built with natural stone to assist with the flow of cars and trucks. Maanteeamet (the Estonian Road Administration) required a grout that would be durable and cou
February 8, 2018 Read time: 2 mins
UltraScape Flowpoint has been used at three new roundabouts as part of the €11 million Juuliku junction and section upgrade near Tallinn


The 9km project involved reconstructing areas of the road network as well as introducing a new 3.4km section of road, two bridges and viaducts and a two-level interchange. An additional three roundabouts were built with natural stone to assist with the flow of cars and trucks. Maanteeamet (the 2666 Estonian Road Administration) required a grout that would be durable and could withstand extreme temperatures, from freezing winters to warm summers.

Contraactors used Flowpoint rapid set flowable grout to point stone setts. Flowpoint is part of the UltraScape Mortar Paving System and as such it has been independently tested to British Standard 7533. Development and testing took place over number of years to ensure a durable finish which will not crack or stain, according to the manufacturer.

Flowpoint’s fluid consistency allows for large areas of paving to be grouted quickly. The flowable nature of the product means it is equally suited to grouting small cobbles on a driveway as it is large paving tiles in urban regeneration projects. This also makes it the ideal product for grouting uneven areas - essential for the Estonian project.

Importantly, Flowpoint can receive foot traffic in one hour and vehicular traffic in four hours. This keeps disruption to motorists and pedestrians to a minimum and allows contractors to move on to their next project quickly.

UltraScape's Mortar Paving System has also been used at Estonia’s Tallinn Old Town project, the Opera House in Dubai, Roxy Cinema in New Zealand and, in the UK, at MediaCity in Salford, the Savoy Hotel in London and the Bullring shopping centre in Birmingham.

For more information on companies in this article

Related Content

  • Vitronic wins an order in Estonia and honours in Dubai
    March 16, 2012
    Machine vision specialist Vitronic and its Estonian partner Alarmtec have won a tender for ten stationary speed enforcement systems from the Estonian Road Administration, while in Dubai the company has announced it has been honoured by the Dubai Police as the best enforcement supplier of 2011.
  • Crack infill system ideal reinstatement solution
    February 17, 2012
    Overnight repair work on a major English motorway has avoided the major traffic disruption and significantly increased road surfacing costs that would have occurred if left untreated.
  • Quality granite from Rajasthan quarry
    November 29, 2013
    High quality Desert Cream Granite is being extracted from a sprawling 300ha site in Mungeria, in the Indian state of Rajasthan. The Barmer district in West India spreads forms part of the Great Indian Desert, also known as the Thar Desert. In summer months temperatures can soar to 51°C and drop to freezing point in winter, while Barmer is also home to a specialty stone, the durable Desert Cream Granite.
  • Nairobi revives city decongestion plan
    March 18, 2016
    Nairobi is looking to tackle its congestion problems - Shem Oirere writes. Authorities in Kenya’s capital Nairobi have revived plans to convert some of the streets in the city into one way roads to deal with chronic traffic congestion that consumes fuel worth millions of shillings and wastes several manhours in traffic jams. Nairobi County governor Dr Evans Kidero said the plan, which is to take effect by the end of December 2015, will affect Moi Avenue, Koinange Street, Tom Mboya Street, River Road and Kir