Skip to main content

Highway installation

In the UK a civil engineering firm is using Wacker Neuson's novel vertical digging system (VDS) on a major contract to up-grade the motorway communication network alongside the M6. The Highways Agency contract involves work along a total of 64km between junctions 32 and 37 and McDermott Construction, together with sister company McFour, has been tasked by main contractor Peek Communications to open a 960mm deep x 410mm wide trench and install large termination boxes every 500m. The job involves bedding four
February 6, 2012 Read time: 2 mins
Productivity is good with the Wacker Neuson machines on the M6 contract and a VDS equipped 38Z3 zero tailswing machine has achieved an output of 285m/day
In the UK a civil engineering firm is using 1651 Wacker Neuson's novel vertical digging system (VDS) on a major contract to up-grade the motorway communication network alongside the M6. The Highways Agency contract involves work along a total of 64km between junctions 32 and 37 and McDermott Construction, together with sister company McFour, has been tasked by main contractor Peek Communications to open a 960mm deep x 410mm wide trench and install large termination boxes every 500m. The job involves bedding four-way sealed ducting in stone with the trench then being backfilled on a continuous basis.

McDermott recently took delivery of nine new Wacker Neuson machines from local dealer Beddoes Machinery Sales of Montgomery for this 24 week contract. The order comprised five mini excavators, a 28Z3, 38Z3, 50Z3 and a pair of 2404s, plus a 6503 and three 9503 wheeled machines with triple booms used for placing stone and backfilling duties. Of the minis, three are equipped with VDS, which allows the operator to tilt the machine's entire superstructure by up to 15º. This feature is important at the M6 project as a lot of the digging has to be carried out on sloping embankments.

Where the embankment is steeper, the machines only have to dig a minimum amount of material away in order to accommodate the up-hill track and then deploy the VDS to level the cab. In the even steeper sections and where access by even a mini is impossible, the company has to resort to a purpose-built trenching attachment.

For more information on companies in this article

Related Content

  • Sandvik drilling rigs boost production
    July 9, 2012
    The drill and blast contractor Technical Drilling and Blasting in the United Arab Emirates (UAE) is standardising on Sandvik rock tools for its fleet of drill rigs. The firm operates across Fujeirah, providing quality gabbro aggregates for construction projects in Dubai and Abu Dhabi. Recognised as one of the worlds hardest rocks, gabbro features a typical density in excess of 3tonnes/m, a crushing factor of 10 and a 61% silica content and demand remains strong for this quality construction material. Every
  • Wacker Neuson reports strong performance
    August 12, 2013
    Wacker Neuson reports a strong financial performance in the second quarter of 2013, despite tough prevailing economic conditions. This represents an improvement also from the first quarter of 2013 when economic performance was weak. The Wacker Neuson Group’s second quarter revenue increased by 15.8% over the previous year, reaching €329 million compared to €284.2 million. An increase in construction activity in April helped boost sales. “In Q2, our revenue rose 28 % on the prior-year quarter to a new record
  • High production asphalt pavers deliver performance
    February 28, 2012
    US style high production pavers are seeing key performance gains - Mike Woof reports. Exhaust emissions regulations and ever tougher safety requirements have pushed manufacturers to develop new and improved pavers aimed at the US market. The rivalry between manufacturers of these machines has also intensified. European manufacturers have developed their own US style pavers in recent years. BOMAG, Dynapac and Vögele have all designed machines using the benefit of their US engineering input in a bid to target
  • R960 demolition machine makes Intermat debut
    January 6, 2017
    Liebherr has taken the wraps off the R960 demolition rig, a 93.5 tonne crawler with a choice of 28m and 34m boom configurations. A replacement for the previous R954C, the R960 is powered by a 240kW Stage IV diesel engine and features the latest Liebherr Demolition Control (LDC) active safety system.