In the UK a civil engineering firm is using Wacker Neuson's novel vertical digging system (VDS) on a major contract to up-grade the motorway communication network alongside the M6. The Highways Agency contract involves work along a total of 64km between junctions 32 and 37 and McDermott Construction, together with sister company McFour, has been tasked by main contractor Peek Communications to open a 960mm deep x 410mm wide trench and install large termination boxes every 500m. The job involves bedding four
February 6, 2012 Read time: 2 mins
Productivity is good with the Wacker Neuson machines on the M6 contract and a VDS equipped 38Z3 zero tailswing machine has achieved an output of 285m/day
In the UK a civil engineering firm is using 1651 Wacker Neuson's novel vertical digging system (VDS) on a major contract to up-grade the motorway communication network alongside the M6. The Highways Agency contract involves work along a total of 64km between junctions 32 and 37 and McDermott Construction, together with sister company McFour, has been tasked by main contractor Peek Communications to open a 960mm deep x 410mm wide trench and install large termination boxes every 500m. The job involves bedding four-way sealed ducting in stone with the trench then being backfilled on a continuous basis.

McDermott recently took delivery of nine new Wacker Neuson machines from local dealer Beddoes Machinery Sales of Montgomery for this 24 week contract. The order comprised five mini excavators, a 28Z3, 38Z3, 50Z3 and a pair of 2404s, plus a 6503 and three 9503 wheeled machines with triple booms used for placing stone and backfilling duties. Of the minis, three are equipped with VDS, which allows the operator to tilt the machine's entire superstructure by up to 15º. This feature is important at the M6 project as a lot of the digging has to be carried out on sloping embankments.

Where the embankment is steeper, the machines only have to dig a minimum amount of material away in order to accommodate the up-hill track and then deploy the VDS to level the cab. In the even steeper sections and where access by even a mini is impossible, the company has to resort to a purpose-built trenching attachment.

For more information on companies in this article

Related Content

  • McCloskey adds Ethiopia to its African coerage
    August 20, 2015
    McCloskey is further developing its sales and support coverage with the addition of Ries Engineering to its global dealer network The Ethiopian dealer Ries Engineering S Co (RESCO) expands the McCloskey distributor coverage worldwide in a growing market. The dealer has already finalised deals with customers and intends to further increase the presence of the McCloskey brand across East Africa. “Having Ries on board will further strengthen our expanding distribution network in Africa. Ethiopia presents
  • Latest innovations in GPS and machine control
    February 22, 2012
    Modern satellite technology is making life easier for everyone on the construction site and in the office. Most major equipment manufacturers are now integrating GPS machine control systems into the design of excavators, bulldozers, pavers, and motor graders. For stake-less work it is a major component for automatic grading, surveying, and excavating systems, with contractors and construction companies using GPS machine control systems to improve operations.
  • Deep and wide with Wirtgen’s W 100 CFi compact milling machine
    May 14, 2018
    The spread of fibre-optic cables, especially for broadband internet access, is advancing rapidly across the world. The Upper Austrian district of Schärding, not far from the German border, is no exception. Engelhartszell is the second community to benefit from this technology. And the contractor, Hemmelmair Frästechnik from Linz, is also making use of cutting-edge technology - in this case made from steel and carbide. A Wirtgen W 100 CFi compact milling machine with deep milling unit is being used for tren
  • Innovative formwork beats bridge design challenges
    February 14, 2012
    Companies are coming up with innovative formwork solutions to overcome "challenging" designs for bridges. Patrick Smith reports