Skip to main content

Highway installation

In the UK a civil engineering firm is using Wacker Neuson's novel vertical digging system (VDS) on a major contract to up-grade the motorway communication network alongside the M6. The Highways Agency contract involves work along a total of 64km between junctions 32 and 37 and McDermott Construction, together with sister company McFour, has been tasked by main contractor Peek Communications to open a 960mm deep x 410mm wide trench and install large termination boxes every 500m. The job involves bedding four
February 6, 2012 Read time: 2 mins
Productivity is good with the Wacker Neuson machines on the M6 contract and a VDS equipped 38Z3 zero tailswing machine has achieved an output of 285m/day
In the UK a civil engineering firm is using 1651 Wacker Neuson's novel vertical digging system (VDS) on a major contract to up-grade the motorway communication network alongside the M6. The Highways Agency contract involves work along a total of 64km between junctions 32 and 37 and McDermott Construction, together with sister company McFour, has been tasked by main contractor Peek Communications to open a 960mm deep x 410mm wide trench and install large termination boxes every 500m. The job involves bedding four-way sealed ducting in stone with the trench then being backfilled on a continuous basis.

McDermott recently took delivery of nine new Wacker Neuson machines from local dealer Beddoes Machinery Sales of Montgomery for this 24 week contract. The order comprised five mini excavators, a 28Z3, 38Z3, 50Z3 and a pair of 2404s, plus a 6503 and three 9503 wheeled machines with triple booms used for placing stone and backfilling duties. Of the minis, three are equipped with VDS, which allows the operator to tilt the machine's entire superstructure by up to 15º. This feature is important at the M6 project as a lot of the digging has to be carried out on sloping embankments.

Where the embankment is steeper, the machines only have to dig a minimum amount of material away in order to accommodate the up-hill track and then deploy the VDS to level the cab. In the even steeper sections and where access by even a mini is impossible, the company has to resort to a purpose-built trenching attachment.

For more information on companies in this article

Related Content

  • AECOM secures five contract wins with Highways England
    January 30, 2017
    Global infrastructure services firm AECOM has secured five contracts with Highways England to deliver highway design services across five separate schemes. The contracts, with a combined worth more of than €29 million to AECOM, are part of Highways England’s Roads Investment Strategy announced in 2014 for maintenance, improvements and upgrades to motorways and major A-class roads. AECOM will delivery of multidisciplinary services for the A38 Derby Junctions scheme in northern England. AECOM has als
  • Chicago Pneumatic scores breaker supply deal in Qatar
    December 15, 2017
    Chicago Pneumatic has supplied a major order of hydraulic breakers to Rock Fall Contracting WLL (RFC), a key civil engineering and earthmoving specialist based in Doha, Qatar. The firm has augmented its fleet of Chicago Pneumatic rig-mounted hydraulic breakers with the addition of new RX8 and RX54 units. The breakers are destined for use in demanding applications within the programme of infrastructure projects for Qatar’s hosting of the IAAF World Athletics Championship in 2019 and the World Cup in 2022.
  • Key expressway route through Hunter Valley
    November 11, 2013
    Australia’s Hunter Valley will benefit from a new high speed expressway, which is currently under construction - Simon Gould reports Located two hours north of Sydney, the Hunter Valley region in New South Wales is one of Australia’s largest producers of coal and wine. With international demand, particularly from Asia, for both continuing to increase, a significant upgrade of infrastructure was required between the region and the port of Newcastle, the world’s largest coal export port. However the strict en
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo