Gubler gets down with a Kemroc EK 100 chain cutter

Boulders are usually removed from site by breaking them with a hammer and then using a backhoe to extract the rubble: a time-consuming process. Swiss construction company Gubler, however, used a Kemroc EK 100 chain cutter to cut down on processing time as well as wear and tear on company equipment. With an EK 100 chain cutter mounted on their 22tonne excavator, Gubler excavated the foundations, footings and service trenches in the typical local molasse rock. The project is a large residential complex and
May 1, 2018 Read time: 3 mins
Foundation and trenching: Kemroc chain cutter in Swiss molasse rock
Boulders are usually removed from site by breaking them with a hammer and then using a backhoe to extract the rubble: a time-consuming process.


Swiss construction company Gubler, however, used a 8755 Kemroc EK 100 chain cutter to cut down on processing time as well as wear and tear on company  equipment.

With an EK 100 chain cutter mounted on their 22tonne excavator, Gubler excavated the foundations, footings and service trenches in the typical local molasse rock. The project is a large residential complex and parking area in the town of Mettmenstetten near Zurich. Work was done with speed and accuracy, according to the company. The job was also completed without creating noise or vibration to annoy people living nearby.

The overburden contains boulders until they hit bedrock. Kemroc’s EK (Erkator) range of chain cutter attachments includes a cutter chain with round attack picks that runs between two cutter drums. This allows the attachment to excavate narrow trenches exactly to the width required; there is no gap between the cutter drums which requires standard types of drum cutter to operate with a sideways swinging motion. Compared to a lengthways drum cutter, a chain cutter operates a lot more smoothly and with lower cost for consumables as well as less wear and tear on the machine.

At the job site in Mettmenstetten, Gubler excavated 2,500m³ of material while excavating 60cm-wide trenches with depths up to 5m. “The EK 100 enabled us to keep the trench width to specification while maintaining vertical side walls resulting in significant savings in time and transport costs for the removal of broken material,” said Markus Gubler, managing director of the company.

“In addition, we were able to use the EK 100 on our 22tonne excavator. If we had to use a breaker we would have had to go up to a larger size excavator. A large part of the excavation was completed in 170 working hours and we also achieved significant savings in fuel costs.”

At the same time, within an area of 4,500m² a total of 120 footings and the perimeter of the underground car park foundations were excavated to within a 5cm variation. “When it came to lining the periphery walls for the underground garage, we were able to save an enormous amount on concrete,” he said.

According to the company’s calculations, the chain cutter covered 50% of its cost on its first job.

“Compared to using a hydraulic breaker which creates noise levels emanating from the job site over 100 dB(A), with the chain cutter it was down to 70 dB(A),” said Gubler.

For more information on companies in this article

Related Content

  • Rebuilding the busy Frankfurt Airport in Germany
    September 12, 2017
    Handling up to 450 take-offs/day, Runway West is Frankfurt Airport’s busiest runway. Over 50% of the aircraft taking off from the airport uses Runway West, and a point worth noting is that this German airport is one of the busiest in Europe. In 2016, Frankfurt Airport handled nearly 61 million passengers, surpassed by Schiphol in Amsterdam and Charles de Gaulle in Paris, Europe’s third and second busiest airports respectively. Meanwhile London’s Heathrow remained Europe’s busiest airport
  • Wirtgen KMA 220 passes with flying colours at Cologne/Bonn Airport
    July 25, 2018
    A Wirtgen KMA 220 produces hydraulically bound base using a mix-in-plant process for recycling at Cologne/Bonn Airport. With the mobile KMA 220 mobile cold recycling mixing plant from Wirtgen, road construction materials can be recycled or upgraded in just about any location. This avoids countless transport trips and is also sustainable and environmentally friendly. Finally, it is extremely economical, according to Wirtgen. This became clear from a job at Cologne/Bonn airport at the end of 2017. The plan
  • Onsite asphalt recycling
    December 15, 2020
    Equipment from Ammann has played a key role in renovating a section of the N2 highway in Switzerland
  • Kronprinsesse Marys Bro bridges Roskilde Fjord
    January 10, 2019
    A BESIX joint venture is giving the royal treatment to the new Kronprinsesse Marys Bro across Roskilde Fjord, writes David Arminas It was announced in September 2016 that Belgian group BESIX, in a joint venture (RBAI) with Italian firm Rizzani de Eccher and Spanish company Acciona Infraestructuras, had been chosen for the €133 million project. The award, by client Vejdirektoratet (Danish Road Directorate), marked the entry of BESIX into the Scandinavian market. Vejdirektoratet praised the winning bid as