Skip to main content

Flexibility assured with Horizontal HSG-40CW gates from Versilis

Canadian road safety equipment manufacturer Versilis says that its latest flexible Horizontal HSG-40CW – 12m in length - is crash-tested to AASHTO MASH requirements. The Horizontal HSG-40CW is part of the Montreal area-based company’s SwiftGate series of barriers that have been sold worldwide. Whether the gates are short or long, they can be made to pivot horizontally or vertically. Importantly, says the company, the gates offer increased visibility using a high surface of reflective material and LED ligh
July 3, 2019 Read time: 2 mins
Canadian road safety equipment manufacturer 2303 Versilis says that its latest flexible Horizontal HSG-40CW – 12m in length - is crash-tested to AASHTO MASH requirements. The Horizontal HSG-40CW is part of the Montreal area-based company’s SwiftGate series of barriers that have been sold worldwide. Whether the gates are short or long, they can be made to pivot horizontally or vertically.


Importantly, says the company, the gates offer increased visibility using a high surface of reflective material and LED lighting. Made of corrosion-resistant materials, the HSG-40CW is designed to withstand harsh environments – such as Canadian winters and summers.

The gate’s arm – from around 2m up to 12m in length - is built with easily replaceable high-density polyethylene arrow-shaped posts and aluminum tubing. The arm's arrow-shaped barricade design offers maximum visibility and reflectivity using an increased flat surface of high intensity retroreflective sheeting - more than double the surface of typical highway gates, according to the company. In the event of an impact, the arrow-shaped posts and chevron bend at the top, allowing the impacting vehicle to go through, minimising damage to the gate and the vehicle. After impact, the arrow-shaped posts and chevron recover their original position.

For more information on companies in this article

Related Content

  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Advanced concrete slipforming technology coming to market
    August 1, 2019
    New concrete slipforming technology is said to offer increased performance over earlier generation equipment - Mike Woof writes
  • Hammerglass barriers for Förbifart Stockholm
    November 25, 2021
    Swedish glazing specialist Hammerglass is supplying around 1,000 transparent sound barrier panels to the Stockholm Bypass – E4 Förbifart Stockholm - project over an 18-month period
  • Bolivia’s new highway
    October 10, 2017
    Bolivia’s new highway will provide better access into mountain areas – Mauro Nogarin writes At the beginning of 2015, work began on the construction and paving for the Tupiza - Atocha - Uyuni highway project. The route is located in Bolivia’s Potosí department: it is 189m in length and forms part of the Southwest Basic Road Network (RVF) of Bolivia. The completion of this important route is requiring funding worth US$150 million, of which 72% is being delivered through loans from the European Investment