Skip to main content

Faster patching

Ennis Prismo is introducing a new pothole reinstatement product called Repair and a novel temporary line marking system. The pothole product is said to be quick, easy and safe to use, as well as being inexpensive to purchase. This product requires little training to use and is said to be ready to carry traffic soon after installation. It is also said to provide a long-lasting repair even on roads with high traffic volumes. Meanwhile the temporary line marking system is said to offer high retroreflectivity e
May 2, 2012 Read time: 1 min
1394 Ennis Prismo is introducing a new pothole reinstatement product called Repair and a novel temporary line marking system. The pothole product is said to be quick, easy and safe to use, as well as being inexpensive to purchase. This product requires little training to use and is said to be ready to carry traffic soon after installation. It is also said to provide a long-lasting repair even on roads with high traffic volumes. Meanwhile the temporary line marking system is said to offer high retroreflectivity even in wet conditions, boosting safety at night. Called Rainline, this high visibility thermoplastic material is said to be quick to install and can be used to denote areas of temporary workings.

For more information on companies in this article

Related Content

  • Crushing and screening advances introduced
    June 10, 2019
    New developments in crushing and screening equipment as well as washing technology will deliver benefits for materials production - Mike Woof writes Competition is tough in the market for quarry material processing equipment, with key firms introducing new systems that are said to boost capacity and performance. Firms offering crushing and screening equipment have expanded their respective ranges, offering additional capabilities for these segments. Mobility and versatility have been key factors in the d
  • Fast road checking
    February 7, 2012
    A sophisticated package for evaluating road condition is now available called e-Spott, from Pipe Hawk. This system is said to be a fast and reliable method of measuring the total bound layer thickness of asphalt laid in a highway reinstatement.
  • Earthmoving machines the backbone of construction
    February 7, 2012
    Earthmoving machines remain the backbone of construction operations - writes Mike Woof. ADTs, excavators and wheeled loaders play pivotal roles in most construction jobs with the earthmoving stage providing a key component of most projects.
  • Prismo Contracting sold
    March 2, 2012
    Ennis Traffic Safety Solutions has sold its UK-based contracting subsidiary, Prismo Contracting Services to DBi Services of Hazleton, Pennsylvania.