Skip to main content

Fast road repairs

ASI Solutions has developed a fast pothole repair technique in the shape of its Rhinopatch process. This comes with a life-time guarantee and is said to offer a fast repair solution when a pothole or other road surface defect fails. The firm says that using this technique means that there is no need for a works team to re-visit a site and further disrupt traffic. The solution is to provide a road repair using replacement material of a superior quality to the existing road surface and to eliminate any joints
May 3, 2012 Read time: 2 mins
3124 ASI Solutions has developed a fast pothole repair technique in the shape of its Rhinopatch process. This comes with a life-time guarantee and is said to offer a fast repair solution when a pothole or other road surface defect fails. The firm says that using this technique means that there is no need for a works team to re-visit a site and further disrupt traffic. The solution is to provide a road repair using replacement material of a superior quality to the existing road surface and to eliminate any joints through the use of heat welding when reinstating the damaged area. The completed road repair is then treated with a proven asphalt preservative to ensure the longevity of the surface. Infrared heat is used and the firm also provides a comprehensive Rhinopatch training regime for contractors using the technique to ensure quality.

The process is said to be suitable for all types of asphalt wearing course, including surface dressing. ASI has also tackled issues surrounding temporary repairs by developing a cold bagged material made from 100% recycled aggregate and a proprietary heat activated Gilsonite emulsion specifically designed to work with the Rhinopatch system. This material can be used by highway authorities to fill emergency response defects and following the emergency repair, a crew can return with ASI's infrared equipment to weld the material into the surrounding surface and provide a Rhinopatch repair. The technique does not require the use of compressed air picks so it is safer and quieter. The process recycles all waste in-situ and results in a joint-free repair that does not spoil the look of the original surface. The system can be used for all types of surface repairs up to 100mm depth including joint failures, trench reinstatements, pavement defects, around ironwork and potholes.

According to ASI, the Rhinopatch system eliminates waste by recycling all existing material and reduces the need for new aggregate extraction by 90%. This also eliminates the need for hand-held power tools that can cause hand/arm vibration injuries, cuts manual handling injuries, and reduces traffic disruptionand lowers CO2 emissions by 85%.

For more information on companies in this article

Related Content

  • Versatile asphalt plants from Marini-Ermont
    April 14, 2022
    MARINI-ERMONT is offering two innovative new continuous flow type asphalt plants that offer a combination of versatility and mobility.
  • CDE looking to turn more North American dirt into dollars
    March 16, 2023
    CDE is primed for growth in North America as the region’s customers increasingly look to turn dirt into dollars.
  • Improving surface extraction efficiency in Brazil
    April 16, 2018
    An attachment from Finnish firm ALLU is proving itself in Brazilian extraction operations Máquina Solo is the ALLU distributor for its Transformer and Processor ranges of equipment throughout Brazil. As the Transformer is essentially designed to fit an excavator or loading shovel, this has made the equipment ideal for large scale surface extraction operations, where transportability and productivity are essential requirements of material handling equipment.
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o