Skip to main content

Fast and easy road drainage repairs

The novel Jig-Brix system is said to offer fast and easy repairs for road ironworks. This plastic inter- locking brick system is used for the construction of underground chambers and for the support of road ironworks. It also requires no mortar, speeding installation. The Jig-Brix system is manufactured from recycled polypropylene which is 100% recyclable and is able to cope with heavy traffic volumes. The Jig-Brix sections lock into place vertically and horizontally without the use of metal clips or scre
February 27, 2019 Read time: 2 mins
The manufacturer claims that its Jig-Brix units are easy and quick to install
The novel Jig-Brix system is said to offer fast and easy repairs for road ironworks. This plastic inter- locking brick system is used for the construction of underground chambers and for the support of road ironworks. It also requires no mortar, speeding installation.


The Jig-Brix system is  manufactured from recycled polypropylene which is 100% recyclable and is able to cope with heavy traffic volumes. The Jig-Brix sections lock into place vertically and horizontally without the use of metal clips or screws. Plastic retaining clips enable secure location of the ironwork before surface material is used, while the outer profile of the chamber moulds itself to surface compounds.

This system is said to be strong and lightweight and does not require specialised tools for installation. The Jig-Brix sections can be adjusted on-site offering different sizes and depths as required.

Road repairs times are reduced and the system is durable, so does not require remedial work.

Related Content

  • Evonik’s VESTENAMER, part of the rubber road revolution
    February 21, 2019
    Rubber modified bitumen is gaining ground, according to speciality chemicals business Evonik The intensified search for better road durability and lower traffic noise - both environmental concerns - has meant an increasing market for rubber-modified bitumen. At the same time, raw material costs for asphalt and specifically for asphalt modification compounds have increased considerably, creating another obstacle to cost-effective road construction. The stakes are high for getting roads more durable
  • Peri formwork for Danish port link tunnel project
    November 29, 2013
    The Nordhavnsvej – Vej- og Tunnelentreprise (Nordhavnsvej) project is Copenhagen’s largest infrastructure project in the last 50 years. The 1.65km-long route will eventually link the Danish capital’s northern port area with the Helsingør motorway. It runs through a very densely built urban area, in parts at depths of up to 22m. One particular challenge regarding the execution was planning the course of the tunnel because the underground structure also crosses a very busy railway line.
  • Gubler gets down with a Kemroc EK 100 chain cutter
    May 1, 2018
    Boulders are usually removed from site by breaking them with a hammer and then using a backhoe to extract the rubble: a time-consuming process. Swiss construction company Gubler, however, used a Kemroc EK 100 chain cutter to cut down on processing time as well as wear and tear on company equipment. With an EK 100 chain cutter mounted on their 22tonne excavator, Gubler excavated the foundations, footings and service trenches in the typical local molasse rock. The project is a large residential complex and
  • Major Europe-Asia bridge connection in Turkey
    July 1, 2014
    The 3rd Bosporus Bridge and the Northern Marmara Motorway will improve transport links between Europe and Asia and cut chronic congestion in Istanbul, Turkey’s largest city - Mike Woof reports Work is now well underway on the 3rd Bosporus Bridge and the Northern Marmara Motorway, providing a new link for Turkish city Istanbul and the region as a whole. This enormous bridge and highway project is breaking several records for Turkey in terms of scale, as well as setting a number of international records for e