Skip to main content

Fast and easy road drainage repairs

The novel Jig-Brix system is said to offer fast and easy repairs for road ironworks. This plastic inter- locking brick system is used for the construction of underground chambers and for the support of road ironworks. It also requires no mortar, speeding installation. The Jig-Brix system is manufactured from recycled polypropylene which is 100% recyclable and is able to cope with heavy traffic volumes. The Jig-Brix sections lock into place vertically and horizontally without the use of metal clips or scre
February 27, 2019 Read time: 2 mins
The manufacturer claims that its Jig-Brix units are easy and quick to install
The novel Jig-Brix system is said to offer fast and easy repairs for road ironworks. This plastic inter- locking brick system is used for the construction of underground chambers and for the support of road ironworks. It also requires no mortar, speeding installation.


The Jig-Brix system is  manufactured from recycled polypropylene which is 100% recyclable and is able to cope with heavy traffic volumes. The Jig-Brix sections lock into place vertically and horizontally without the use of metal clips or screws. Plastic retaining clips enable secure location of the ironwork before surface material is used, while the outer profile of the chamber moulds itself to surface compounds.

This system is said to be strong and lightweight and does not require specialised tools for installation. The Jig-Brix sections can be adjusted on-site offering different sizes and depths as required.

Road repairs times are reduced and the system is durable, so does not require remedial work.

Related Content

  • Mobile measuring of road markings
    February 9, 2012
    Road markings and raised pavements markers (RPMs) are important tools in securing efficient and safe traffic flow, and the high visibility of both is an important task in road maintenance, says DELTA.
  • Swell times for swale construction with a Sidewinder
    October 9, 2018
    Specialised swale construction featured in Northern England recently UK contractor Balfour Beatty examined different methods for building swales along the Norwich Northern Distributor Road near the English city of Norwich. Balfour decided to trial specialised road-widening machines, specially configured excavator buckets and modified compaction equipment. Excavators and dump trucks prepared the area for placement of sub-base material. The swale areas were constructed using both conventional methods as wel
  • New equipment for materials testing
    January 13, 2014
    Leading formwork manufacturers have secured some impressive contracts in Africa, as the continent’s transport infrastructure continues to improve at a rapid pace. Meanwhile, other bridgework equipment companies are also seeing their products in demand in Africa, as well as North America and Australia. Guy Woodford reports
  • World growth in geosynthtics set to rise
    February 17, 2012
    With geosynthetics sales set to grow rapidly in the next three years, manufacturers are preparing for the demand. Patrick Smith reports. Global demand for geosynthetics is projected to increase 5.3% annually to 4.7 billion m² in 2013 with countries such as China, India and Russia expected to post the strongest gains through the forecast period. All are building large-scale infrastructure developments and face evolving environmental protection regulations and strict building construction codes.