Skip to main content

Fast and easy road drainage repairs

The novel Jig-Brix system is said to offer fast and easy repairs for road ironworks. This plastic inter- locking brick system is used for the construction of underground chambers and for the support of road ironworks. It also requires no mortar, speeding installation. The Jig-Brix system is manufactured from recycled polypropylene which is 100% recyclable and is able to cope with heavy traffic volumes. The Jig-Brix sections lock into place vertically and horizontally without the use of metal clips or scre
February 27, 2019 Read time: 2 mins
The manufacturer claims that its Jig-Brix units are easy and quick to install
The novel Jig-Brix system is said to offer fast and easy repairs for road ironworks. This plastic inter- locking brick system is used for the construction of underground chambers and for the support of road ironworks. It also requires no mortar, speeding installation.


The Jig-Brix system is  manufactured from recycled polypropylene which is 100% recyclable and is able to cope with heavy traffic volumes. The Jig-Brix sections lock into place vertically and horizontally without the use of metal clips or screws. Plastic retaining clips enable secure location of the ironwork before surface material is used, while the outer profile of the chamber moulds itself to surface compounds.

This system is said to be strong and lightweight and does not require specialised tools for installation. The Jig-Brix sections can be adjusted on-site offering different sizes and depths as required.

Road repairs times are reduced and the system is durable, so does not require remedial work.

Related Content

  • Effective drainage construction with Kijlstra
    October 27, 2016
    Drainage products specialist drainage Kijlstra is introducing a novel push-fit drainage solution. This new jointing system allows fast assembly of drainage systems, reducing construction time. The new culverts from Kijlstra can help speed construction and civils installations and feature a novel rubber-sealed, push-fit jointing system. This is said to make installation quicker and simpler and avoids the need to apply primer and a jointing material to achieve a watertight finish, as with conventional units
  • Innovative new drainage solutions will help keep roads free from water
    October 2, 2014
    An array of new technologies will help optimise road drainage and minimise flooding risks - Mike Woof reports In the UK the specialist contractor Lanes Group has carried out extensive inspection work of the drainage systems for the M6 toll route around the city of Birmingham. A powerful zoom camera has been used to carry out the inspection work for Midland Expressway, which operates and maintains the 43km-long motorway, running from Coleshill to Cannock.
  • Milling versatility on German road job
    March 22, 2017
    Milling efficiently with a versatile, mid-sized machine has offered benefits on a German road job. A German contractor has found that using a mid-sized milling machine from Wirtgen has offered a good combination of both versatility and productivity for a road rebuild job. Kassel-based milling specialist VORO has used a Wirtgen W 100 CFi to upgrade the surface of a section of the busy B3 route. The B3 is an important route and runs 755km from Buxtehude in the north of Germany through to the Swiss border in t
  • Machine control technology evolving fast
    February 8, 2012
    The machine control market is evolving fast and is increasingly becoming part of a much wider construction site management concept, Mike Woof reports. Machine control technology has come a long way in the past 20 years and the development of 2D and 3D systems has been rapid in the construction sector.