Skip to main content

Fast and easy road drainage repairs

The novel Jig-Brix system is said to offer fast and easy repairs for road ironworks. This plastic inter- locking brick system is used for the construction of underground chambers and for the support of road ironworks. It also requires no mortar, speeding installation. The Jig-Brix system is manufactured from recycled polypropylene which is 100% recyclable and is able to cope with heavy traffic volumes. The Jig-Brix sections lock into place vertically and horizontally without the use of metal clips or scre
February 27, 2019 Read time: 2 mins
The manufacturer claims that its Jig-Brix units are easy and quick to install
The novel Jig-Brix system is said to offer fast and easy repairs for road ironworks. This plastic inter- locking brick system is used for the construction of underground chambers and for the support of road ironworks. It also requires no mortar, speeding installation.


The Jig-Brix system is  manufactured from recycled polypropylene which is 100% recyclable and is able to cope with heavy traffic volumes. The Jig-Brix sections lock into place vertically and horizontally without the use of metal clips or screws. Plastic retaining clips enable secure location of the ironwork before surface material is used, while the outer profile of the chamber moulds itself to surface compounds.

This system is said to be strong and lightweight and does not require specialised tools for installation. The Jig-Brix sections can be adjusted on-site offering different sizes and depths as required.

Road repairs times are reduced and the system is durable, so does not require remedial work.

Related Content

  • Innovations in aggregate production
    February 20, 2012
    Innovations abound in the aggregate production sector - Mike Woof reports. With road construction accounting for a significant percentage of aggregate production, developments in this industry are of major importance for the highway sector. Technical advances in aggregate production methods have pushed technological boundaries, resulting in cost/tonne reductions for products and improving operating efficiency for major producers.
  • Brazilian contractor uses novel methods for high quality road
    January 5, 2015
    Cold-in place recycling method provides fast road rebuild in Brazil In Brazil a road contractor has carried out a high quality road rebuilding job, using novel techniques. Contractor Brown Brown is located in Santa Teresinha in the state of Bahia and recently carried out a two-week job for the company to rehabilitate sections of highway BR-381. The highway is an important route in Brazil and runs from Sao Paulo to Belo Horizonte. Highway BR-381 or Rodovia Fernão Dias, as it is called, stretches some 576km
  • Innovations in formwork aid project completion
    February 14, 2012
    Innovative formwork solutions are helping to get projects completed on or before time, meaning savings in time and money as Patrick smith reports. The use of flexible, modular formwork to create innovative structures out of concrete is helping to increase productivity and thus drive down completion time and costs.
  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap