Skip to main content

Efficient drainage solutions from AWMS

Alumasc Water Management Solutions (AWMS) is offering innovative drainage solutions from its leading civil drainage brand Gatic, ideal for highways applications. The Slotdrain is a novel, high capacity surface water drain. Its Filcoten is an advanced, lightweight concrete channel system that offers strength, high performance and environmental compatibility Meanwhile the firm claims that its EnviroKerb product is the lightest, strongest and greenest range of kerb drainage solutions.
April 5, 2017 Read time: 1 min
AWMS has developed novel solutions for effective highway drainage
RSSAlumasc Water Management Solutions (AWMS) is offering innovative drainage solutions from its leading civil drainage brand Gatic, ideal for highways applications.

The Slotdrain is a novel, high capacity surface water drain. Its Filcoten is an advanced, lightweight concrete channel system that offers strength, high performance and environmental compatibility Meanwhile the firm claims that its EnviroKerb product is the lightest, strongest and greenest range of kerb drainage solutions.

Related Content

  • Idromeccanica Ramtec shows RT 1600 and RT 590
    April 20, 2012
    Idromeccanica Ramtec brought two models from its expanded hammer range to INTERMAT. Models such as the RT 1600 and RT 590 brought to the show have additional features but also retain proven aspects of the earlier models, which remain available. Changes in the latest models include improved noise levels and compatibility with a larger range of excavators. The latest models also absorb vibrations at the arm of the excavator to a greater degree than in the past.
  • New lanes open on New Jersey Turnpike
    October 31, 2014
    The New Jersey Turnpike Authority has opened new lanes on the New Jersey Turnpike between Interchange 6 and 9.
  • Zhejiang Jiashao Bridge Investment & Development Co
    April 6, 2017
    Located in Zhejiang Province of China, Jiashao Bridge spans the Qiantang River and connects the cities of Jiaxing and Shaoxing. The total length of the bridge project is 10.14km and carries an eight-lane expressway The Qiantang River suffers from a high flow rate of up to 7.5m/s. As the tidal range is around 7-9m, the water depth is less than 2m in time of low level tide, so ships can only move at high tide and large scale ship-lifting equipment cannot be used downstream of Jiashao Bridge. However, to
  • Globecore offers improved bitumen storage
    October 27, 2016
    Improved bitumen storage is claimed for the new SBM-15 tank from GlobeCore. The firm has upgraded its existing design of modified bitumen storage tank to increase capacity, efficiency and versatility. A key feature is the new structural design with its downwards cone-shaped bottom. This is said to solve the problem of heat loss in the lower part of the tank while a minimum 200mm of heat insulation ensures it is thermodynamically efficient. The new model is 500mm shorter, allowing a customer to transport