Skip to main content

CTE adds to truck-mount range

CTE has unveiled the ZED 20.2 - its new articulated truck-mounted platform with a loading capacity of up to 300kg and 20m working height. Said to represent the evolution of ZED 20C, the ZED 20.2 platform is aimed at meeting the increasing demand of the European market to provide machines with capacities increased on license B for greater versatility of use. The platform has an improved hydraulic rotation lock and ring rotation up to 340°. The ZED 20.2 is also said by CTE to have the same compactness as the
November 8, 2012 Read time: 2 mins
4846 CTE has unveiled the ZED 20.2 - its new articulated truck-mounted platform with a loading capacity of up to 300kg and 20m working height.

Said to represent the evolution of ZED 20C, the ZED 20.2 platform is aimed at meeting the increasing demand of the European market to provide machines with capacities increased on license B for greater versatility of use.

The platform has an improved hydraulic rotation lock and ring rotation up to 340°. The ZED 20.2 is also said by CTE to have the same compactness as the ZED 20C and ZED 20 CH platforms, with a stowed height of just 2.5m.

Meanwhile, patented H stabilisation with connecting rods is said to guarantee the release of the beam, and consequently the stabiliser, in one movement, without the aid of screw jacks and of cylinders. When working with the platform near a pavement, you can stabilise the platform with two stabilisers on the pavement and two on the street. The ‘A’ shape H stabilisation system reduces the usual 220mm difference in level between the pavement and street to just 120mm.

The ZED 20.2 has, according to CTE, a new ergonomic protection panel in the basket to ensure better visibility and ease of use. The platform’s controls are positioned tilted towards the operator and repaired by a new hinged lid.

For more information on companies in this article

Related Content

  • Brisbane’s Airport: Innovative Management of One of the World’s Busiest Runways
    June 26, 2014
    When it comes to runways, there are few busier then Brisbane’s main runway. Servicing both domestic and international travel, with over 200,000 movements per year, operating without a curfew Brisbane’s main runway is the busiest in Australia. For maintenance, crews only have a limited period of time to determine the pavement condition, normally during the night, making the detection of pavement faults difficult. To resolve this issue, a new high speed pavement scanner was used to rapidly survey the pavem
  • BOMAG’s new asphalt paver range
    November 26, 2021
    Road construction machinery specialist BOMAG is introducing a new asphalt paver range. In addition, the company is also launching its BOMAG Advanced Pave system, which is said to be a digital co-pilot package
  • Developments in excavators and loaders
    February 14, 2012
    In the earthmoving sector, much development is being seen in excavators and wheeled loaders used for digging and loading, Mike Woof reports
  • G&Z launching new concrete placer
    March 3, 2015
    New material placer being introduced by G&Z – Mike Woof writes. Guntert & Zimmerman is now lifting the wraps from its new MP550 material placer, having announced last year that design work was underway. This machine is designed to boost throughput and overall productivity on site, while being versatile, easy to maintain and service and offering low running costs. According to the firm, the MP550 is the most versatile material placer on the market as it can handle a wide variety of concrete slumps as well as