Skip to main content

CTE adds to truck-mount range

CTE has unveiled the ZED 20.2 - its new articulated truck-mounted platform with a loading capacity of up to 300kg and 20m working height. Said to represent the evolution of ZED 20C, the ZED 20.2 platform is aimed at meeting the increasing demand of the European market to provide machines with capacities increased on license B for greater versatility of use. The platform has an improved hydraulic rotation lock and ring rotation up to 340°. The ZED 20.2 is also said by CTE to have the same compactness as the
November 8, 2012 Read time: 2 mins
4846 CTE has unveiled the ZED 20.2 - its new articulated truck-mounted platform with a loading capacity of up to 300kg and 20m working height.

Said to represent the evolution of ZED 20C, the ZED 20.2 platform is aimed at meeting the increasing demand of the European market to provide machines with capacities increased on license B for greater versatility of use.

The platform has an improved hydraulic rotation lock and ring rotation up to 340°. The ZED 20.2 is also said by CTE to have the same compactness as the ZED 20C and ZED 20 CH platforms, with a stowed height of just 2.5m.

Meanwhile, patented H stabilisation with connecting rods is said to guarantee the release of the beam, and consequently the stabiliser, in one movement, without the aid of screw jacks and of cylinders. When working with the platform near a pavement, you can stabilise the platform with two stabilisers on the pavement and two on the street. The ‘A’ shape H stabilisation system reduces the usual 220mm difference in level between the pavement and street to just 120mm.

The ZED 20.2 has, according to CTE, a new ergonomic protection panel in the basket to ensure better visibility and ease of use. The platform’s controls are positioned tilted towards the operator and repaired by a new hinged lid.

For more information on companies in this article

Related Content

  • CTE showcases its ZED 21.2 JHV truck-mounted articulated platform
    July 7, 2016
    CTE has a new video for CTE ZED 21.2 JHV, the truck-mounted articulated platform launched on the market at bauma 2016. The video, made with the help of a drone, emphasises the strengths of the platform in a particularly innovative way thanks to the use of graphic elements that capture the viewer’s attention. The new S3 (Smart Stability System), fully proportional controls with ramps, the simultaneous movements, the variable engine speed depending on the number of boom manoeuvres, the design of the
  • CTE’s ideal platform
    January 6, 2017
    A new truck mounted articulated platform with increased capacity up to 300kg and 21metre working height with 10metre outreach is being launched by CTE at Intermat 2012. The ZED 21 JH, part of the firm’s established ZED line, is said to be an evolution of the ZED 21 J with a redesigned boom that is more compact and parallel to the articulated arm. The new model’s jib inclination has been increased from 110 ° to 145 °, its controls are tilted towards the operator to improve visibility and ease of use, and the
  • CTE’s ideal platform
    April 12, 2012
    A new truck mounted articulated platform with increased capacity up to 300kg and 21metre working height with 10metre outreach is being launched by CTE at Intermat 2012. The ZED 21 JH, part of the firm’s established ZED line, is said to be an evolution of the ZED 21 J with a redesigned boom that is more compact and parallel to the articulated arm. The new model’s jib inclination has been increased from 110 ° to 145 °, its controls are tilted towards the operator to improve visibility and ease of use, and the
  • CTE’s world premiere for new platforms
    April 19, 2016
    Italian company CTE is introducing two new models belonging to its new telescopic truck-mounted platform range, CTE B-LIFT. The company says of the world premieres that the name of the range shows a change of model designation to mark the changes made to the entire range, and the use of high-performance SSAB Strenx steel helps to reduce thickness and the weight of the boom. Changes have also been made to the electrical and hydraulic systems with the introduction of a CAN BUS management system and a new h