Skip to main content

Chicago Pneumatic supplying lighting for Middle East

Chicago Pneumatic has secured a major sale of its durable LED light towers in Kuwait. The firm’s authorised distributor General Transportation & Equipment Company (GTE) placed an order for 25 CPLT V15 LED models. The light towers will provide crucial illumination for a time-sensitive construction project being carried out by local contractor Al-Yousifi Engineering & Construction. GTE was originally asked to provide metal halide light towers by the contractor. However, due to the time and cost-sensitive
November 9, 2017 Read time: 3 mins
This order represents the first sale of CPLT V15 LED light towers in the Middle East

6097 Chicago Pneumatic has secured a major sale of its durable LED light towers in Kuwait

The firm’s authorised distributor General Transportation & Equipment Company (GTE) placed an order for 25 CPLT V15 LED models. The light towers will provide crucial illumination for a time-sensitive construction project being carried out by local contractor Al-Yousifi Engineering & Construction. 

GTE was originally asked to provide metal halide light towers by the contractor. However, due to the time and cost-sensitive nature of the development, GTE advised the client to consider more efficient LED models. As Ejazul Hassan, equipment sales manager for GTE, said “The CPLT V15 LED is highly efficient, making it ideal for projects requiring a large number of light towers. With this model, users can save on both fuel and maintenance costs. For instance, the LED’s lifespan is 30,000 hours, compared to 6,000 hours provided by a metal halide bulb. This means the CPLT V15 LED’s bulbs don’t need to be replaced for approximately three years.”

To highlight the benefits of opting for LED, GTE carried out a demonstration. The contractor’s technical team observed the features of both units, from the quality of illumination and compactness of the machines to noise levels. “When we were doing the demonstration, one of the team asked me if the light tower’s engine was running because he couldn’t hear it,” said Hassan.

The CPLT V15 LED also showed low operational costs and high light coverage. The LED unit provides savings of around 2,000 litres of fuel/2,000 hours of operation. “The LED offered 150 hours of continuous runtime compared to 57 hours provided by the metal halide model,” said Hassan. The CPLT V15 LED was shown to be capable of covering a 5,000m2 area while the metal halide model could only illuminate an area of up to 4,000m2. After the demonstration the contractor’s technical team decided to retain the LED demo unit and ordered 24 more light towers. Because of the harsh conditions that the light towers are likely to operate within, the CPLT V15 LED features a durable polyethylene canopy that protects vital internal components. The canopy features wide doors to allow easy maintenance access to the machine, including service components and drains. The light tower also has a frame that prevents any excess fluid escaping.

Even in demanding conditions, the CPLT V15 LED offers good safety on site due to its four heavy-duty stabilisers and level indicator. The light tower’s compact and lightweight design makes it easy to move. It can also be transported with the mast in the vertical position, allowing safer transportation and installation.

For more information on companies in this article

Related Content

  • Better maintenance is on the Horizon for UK’s Warrington Council
    May 15, 2018
    Good, readable analysis of road surfaces to ensure sufficient maintenance funding is an essential part of asset management. The technical side of ensuring a good road surface is integral to maintaining safe, superior highway infrastructure. But securing sufficient government funding for such work – repairs and new-build – based on the current road surface is also essential. To evaluate road conditions and structure for such a business case, one UK local council turned to software provider Yotta.
  • Giatec promises Smart Concrete
    April 27, 2018
    Giatec’s Smart Concrete concept allows ready mix concrete suppliers to offer optimised mixes to their customers – and to charge more for them. Giatec, which makes concrete sensors and associated software and apps, works with the concrete producers to calibrate their mixes. The concrete company then supplies Giatec’s maturity monitoring sensors as part of the concrete package. “The ready mix suppliers get information straight away so that they can adjust their mixes if necessary,” says Giatec business
  • Giatec promises Smart Concrete
    April 27, 2018
    Giatec’s Smart Concrete concept allows ready mix concrete suppliers to offer optimised mixes to their customers – and to charge more for them. Giatec, which makes concrete sensors and associated software and apps, works with the concrete producers to calibrate their mixes. The concrete company then supplies Giatec’s maturity monitoring sensors as part of the concrete package. “The ready mix suppliers get information straight away so that they can adjust their mixes if necessary,” says Giatec business
  • Acrow supplies temporary bridge during Turcot Interchange project
    June 28, 2018
    Acrow Bridge has supplied a long-term temporary modular bridge to main contractor KPH Turcot for its work on the Turcot Interchange reconstruction in Montréal, Canada. The 32.3m-long Turcot modular steel bridge - Acrow’s longest clear span bridge in Canada – is 5m wide and has an orthotropic deck. The rented Acrow components arrived on site late last year and the bridge was opened to traffic in December. It is expected to be in place for two years. The Turcot Interchange is a three-level stack freeway int