Skip to main content

Upgrade of Lánchíd Bridge by May

Four tenders in for work on Budapest’s Chain Bridge - Széchenyi Lánchíd.
By David Arminas December 23, 2020 Read time: 2 mins
Budapest Széchenyi Lánchíd Bridge upgrade to start by mid-2021 (photo © Julianelliott/Dreamstime)

Upgrade work on the Hungarian capital's Chain Bridge will be underway by May, according to Napi.hu, a Hungarian online business news portal.

The bridge, officially the cast iron suspension Széchenyi Lánchíd, was built in 1849 as the first permanent bridge across the Danube River in Hungary. Although it was designed by English engineer William Tierney Clark and built by Scottish engineer Adam Clark, it was named after István Széchenyi, a major supporter of its construction.

Four local companies have tendered for the repair work - Strabag Altalanos Epito, SDD Konzorcium, Kozgep Epito- es Femszerkezetgyarto and A-Hid Epito. A winner is expectedc to be chosen early next year.

Upgrading has been at least two-years in the planning to improve the 380m-long, 14.8m-wide bridge. Cost issues  have hampered renovation planning

At the time of construction, its centre span of 202m was one of the longest in the world. The bridge has the official name of István Széchenyi, a major supporter of its construction, although it is commonly called the Chain Bridge.

The bridge was updated and strengthened in 1914 but during World  War Two it was destroyed in January 1945 by the retreating German occupation army. It was rebuilt by 1949 and remains as one  of only two surviving two bridges designed by William Tierney Clark. The other is the suspension bridge over the Thames at Marlow, England.

Related Content

  • Causeway and immersed road for LagoonHull
    December 1, 2021
    The agency proposing the UK’s LagoonHull project says it’s development and construction costs could be between €1.2-2.4 billion.
  • Renovation works to target over 1,200kms of Hungarian roads
    August 28, 2012
    Undersecretary of the Hungarian Ministry of National Development (NFM) responsible for infrastructure, Pal Volner, has revealed that renovations on more than 1,200kms of roads in Hungary will be completed by the end of 2014. The works, in line with the country's New Szechenyi Plan (USZT), will cost €372.77 million (HUF 104bn).
  • Road repair increase for Hungary
    December 17, 2012
    Undersecretary of the Hungarian Ministry of National Development (NFM) responsible for infrastructure, Pal Volner, has revealed that renovations on more than 1,200km of roads in Hungary will be completed by the end of 2014. The works, in line with the country's New Szechenyi Plan (USZT), will cost €372.77 million (HUF 104bn).
  • Nepal flyover construction underway
    March 28, 2023
    Flyover construction is underway on a key Nepalese route.