Skip to main content

Upgrade of Lánchíd Bridge by May

Four tenders in for work on Budapest’s Chain Bridge - Széchenyi Lánchíd.
By David Arminas December 23, 2020 Read time: 2 mins
Budapest Széchenyi Lánchíd Bridge upgrade to start by mid-2021 (photo © Julianelliott/Dreamstime)

Upgrade work on the Hungarian capital's Chain Bridge will be underway by May, according to Napi.hu, a Hungarian online business news portal.

The bridge, officially the cast iron suspension Széchenyi Lánchíd, was built in 1849 as the first permanent bridge across the Danube River in Hungary. Although it was designed by English engineer William Tierney Clark and built by Scottish engineer Adam Clark, it was named after István Széchenyi, a major supporter of its construction.

Four local companies have tendered for the repair work - Strabag Altalanos Epito, SDD Konzorcium, Kozgep Epito- es Femszerkezetgyarto and A-Hid Epito. A winner is expectedc to be chosen early next year.

Upgrading has been at least two-years in the planning to improve the 380m-long, 14.8m-wide bridge. Cost issues  have hampered renovation planning

At the time of construction, its centre span of 202m was one of the longest in the world. The bridge has the official name of István Széchenyi, a major supporter of its construction, although it is commonly called the Chain Bridge.

The bridge was updated and strengthened in 1914 but during World  War Two it was destroyed in January 1945 by the retreating German occupation army. It was rebuilt by 1949 and remains as one  of only two surviving two bridges designed by William Tierney Clark. The other is the suspension bridge over the Thames at Marlow, England.

Related Content

  • Czech minister Tok warns Eurovia to speed up D1 bridge repairs
    January 8, 2015
    The Czech transport minister has given construction firm Eurovia until April to start repairs on two bridges it built or face having its bank guarantees withdrawn. Transport Minister Dan Tok, who until December was the chief executive of Skanska in the Czech Republic, said he would call for a new tender for the repairs if no action is taken by Eurovia, according to a report by the Czech internet news portal iDNES. Tok said that the road bridges constructed six years ago on the D1 motorway slip road in
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b
  • Historic bridge upgrade in Minneapolis
    July 28, 2022
    A historic bridge upgrade in Minneapolis is close to completion.