Skip to main content

UK road maintenance budgets further stretched, says ALARM survey

Indications last year of an improving condition for the UK’s road maintenance have not been sustained, according to a new survey.
By David Arminas March 25, 2020 Read time: 3 mins
Despite concerns over road maintenance budgets, a pothole is filled every 21 seconds in England and Wales, according to the latest ALARM survey

Indications last year of an improving condition for the UK’s road maintenance have not been sustained, with an average 16% drop in highway maintenance budgets.

This year there are 11,651km (7,240 miles) fewer roads reported to be in “good” structural condition and with 15 years or more of life remaining, according to the Annual Local Authority Road Maintenance (ALARM) survey.

There are also 1,770km (1,100 miles) more of roads classed as “poor” with less than five years’ life remaining, notes the 25th annual survey published by the UK’s Asphalt Industry Alliance. The AIA represents companies producing raw materials for asphalting roads.

Meanwhile, there is a continued increase in the number classed as “adequate” with between 5-15 years’ life remaining, “suggesting an ongoing slide towards mediocrity”, says the survey.

Average highway maintenance budgets are down 16%, to €22.2 million (£20.7 million) per local authority, versus around €26.3 million (£24.5 million) for 2018/19.

The survey says that an estimated one-time catch-up cost of just over €11.8 billion (£11 billion) is needed to get roads back into a reasonable, steady state. This is up from almost €10.7 billion (£10 billion) reported in 2019. Even so, it would take around 11 years to clear the maintenance backlog if local authorities had the funding and resources available to do the work.

“Highway maintenance budgets have dropped back to where they were two years ago,” said Rick Green, chair of the AIA. “Over the past 25 years we have repeatedly seen this pattern of short-term cash injections to stem accelerating decline, only to be followed by further years of underfunding. This stop-start approach has been wasteful and… contributed to a rising bill to put things right.”

He noted that the €26.3 billion (£2.5 billion) extra funding over the next five years announced in the Budget will certainly be welcomed by hard-pressed local authority highway teams.

“However, £500 million [€535.3 million] extra a year divided across English local authorities is a long way off the one-time catch-up cost of £11.14 billion [€11.95 billion] that ALARM 2020 indicates is needed to bring our local roads across England, London and Wales up to a level from which they can be maintained cost effectively going forward,” he said.

“What’s needed is additional and sustained investment to help underpin the Government’s levelling-up strategy and social cohesion goals, as well as complement its ambitions for more sustainable modes of transport.

Green also said that this year’s ALARM survey is published at a time of unprecedented challenges due to the spread of the COVID-19 virus, and understandably, the country’s resources will need to be prioritised accordingly. Looking ahead, ALARM 2020’s findings support the view that a sustainably-funded, well-maintained local road network will need to be part of securing recovery and regrowth.

The 2020 ALARM survey was completed by 67% of local authorities responsible for roads in England and Wales and was carried out between December 2019 and February this year. Findings relate to roads maintained by local authorities only and excludes roads designated part of the UK’s Strategic Road Network which is managed by Highways England, a standalone government company.

The full ALARM survey is available to download at www.asphaltuk.org.

 

For more information on companies in this article

Related Content

  • Bangladesh road repair budget boosted
    February 12, 2018
    Bangladesh is in desperate need of road repairs, with insufficient funding exacerbating the problem. This comes from a new survey carried out by Bangladesh's Roads and Highways Department (RHD). The results of the survey suggest that the country needs some US$2.55 billion to be spent on repairing and maintaining the country's roads over the next five years. Flooding during August-October 2017 caused damage to 1,177km of the road network. However the primary cause of road damage comes from the use of heavy
  • Wacker Neuson reports strong growth for 2022
    March 29, 2023
    Wacker Neuson is reporting strong growth for 2022.
  • Parsons wins UK traffic census contract
    April 11, 2014
    Consultant Parsons Brinckerhoff is now carrying out National Road Traffic Census counts across England, Scotland and Wales on behalf of the Department for Transport. This contract almost doubles the company’s previous activity in this area and it will now be managing 1,500 people to undertake over 6,000 traffic count surveys/year. The company is also introducing new le technology to this role and will be trialling a new in-house traffic survey iPad ‘app’. The firm is working closely with the Department for
  • Cycling safety concern in the UK
    June 25, 2021
    Cycling safety is a concern in the UK.