Skip to main content

Sweden holds firm on its planned road maintenance

Trafikverket said projects are on schedule despite the covid crisis.
By David Arminas April 20, 2020 Read time: 1 min
Swedish projects on track, says Trafikverket (photo Kennerth Kullman/Dreamstime)

Sweden’s road authority Trafikverket has said it will keep to its planned road maintenance schedule during the coronavirus outbreak.

It is also not possible to get larger projects off the ground ahead of their planned start dates because of the need to go out to international tender. The procurement process must give international companies time to prepare their bids.

Trafikverket said that the outbreak of Covid-19 and government lockdowns have not slowed down or interfered with projects already underway.

Trafikverket’s announcement comes after the head of Mesta, a government infrastructure business in neighbouring Norway, said she wants to see more tunnel rehabilitation work brought forward as the Covid-19 crisis continues.

Marianne Bergmann Røren said there are 55 tunnels that need to be upgraded before 2025 and she urged authorities to give the green light for these projects sooner rather than later.

Her call comes as the company- the largest player in Norway’s road maintenance market - announced it was temporarily laying off 100 employees. Mesta is owned by the Norwegian Ministry of Trade and Industry and must compete for each contract in the open market.

Related Content

  • Rapid replacement of multiple bridges – the plan
    December 14, 2017
    The US State of Pennsylvania is saving itself $220 million over 10 years on a programme to replace 558 bridges with an unusual public private partnership approach - Kristina Smith writes It is called the Rapid Bridge Replacement Programme with good reason. Pennsylvania’s Department of Transport, PennDOT, wants to see no less than 558 structurally deficient bridges replaced with newly designed and constructed ones, all within four years. Using traditional forms of procurement this programme would be like
  • Futureproofing UK construction equipment resilience
    May 5, 2021
    Rob Oliver is the longstanding CEO of the Construction Equipment Association (CEA), the UK trade association for the UK construction equipment industry. Guy Woodford recently caught up with him to discuss the industry’s health and the key issues facing the CEA and its members in 2021 and beyond.
  • Oslofjord Tunnel closed for repairs for up to three weeks
    May 12, 2017
    The 7km subsea Oslofjord Tunnel in Norway will be closed for up to three weeks after a truck caught fire in the tunnel on May 5. Norwegian media report that a 500m stretch was damaged - tunnel vault, cables, insulation and road surface. The tunnel is equipped with 25 evacuation rooms that can be sealed off from the main tunnel. Each room can provide pressurised space for up to 50 people while a fire is being fought. However, the latest incident has spurred the government to announce that a second tube will
  • US labour shortage: an ever-growing problem
    May 31, 2022
    It’s a tight labour market that is hurting the construction sector. But there are ways to ensure a company has the best possible recruitment drive, according to the AEM, Association of Equipment Manufacturers*.