Skip to main content

South Eastern Nigerian road project stalls

Construction work on the upgrade of the road connecting Calabar with Itu and Ikot Ekpene in South East Nigeria has once again ground to a halt. The contractor carrying out the work, Julius Berger, has transferred personnel and equipment to other projects. This action has been taken due to a delay in payments for the work to the contractor. The road is now in extremely poor condition, which is a key problem for transport between Cross River State and Akwa Ibom State. Much of the road is now said to be virt
July 24, 2019 Read time: 2 mins

Construction work on the upgrade of the road connecting Calabar with Itu and Ikot Ekpene in South East Nigeria has once again ground to a halt. The contractor carrying out the work, Julius Berger, has transferred personnel and equipment to other projects. This action has been taken due to a delay in payments for the work to the contractor.

The road is now in extremely poor condition, which is a key problem for transport between Cross River State and Akwa Ibom State. Much of the road is now said to be virtually impassable, with heavy vehicles having to take a much longer route to the north via Umauhia. Light vehicles such as cars and motorcycles are still able to use the many dirt roads criss-crossing the area, although journey times are longer and safety and capacity are key concerns.

That Calabar, one of Nigeria’s important cities, is suffering such poor transport connections as a result is a major problem for the economy of Cross River State in particular and the south east of the country in general.

The two lane road was surfaced in the 1970s and then patched up periodically, with the route becoming progressively more dilapidated. The project to widen the route to a dual carriageway was one of several put forward by president Buhari in the run up to his election for his second period in office.

Related Content

  • Bikers and animals
    May 10, 2016
    In the US a kindhearted motorcyclist put her life at risk when she saw a kitten fall out of a vehicle while she waited at the traffic lights at a busy intersection. The woman rider ran forward from her motorcycle, gesturing at vehicles to stop so as to prevent the ginger kitten from being run over. The woman handed the kitten to a passerby before returning to her motorcycle and moving it to the side of the intersection. She then collected the animal and has since taken it home, renaming it Skidmarks.
  • The UK’s pothole crisis is causing vehicle damage and crashes
    July 1, 2019
    The poor state of maintenance of UK roads is a factor in many crashes while also causing damage to vehicles according to road safety charity, IAM RoadSmart. In a bid to address the issue, IAM RoadSmart is calling for a long-term plan to tackle the problem. According to a survey it conducted, nearly 50% of the respondents have experienced pothole damage to their vehicles. The government’s Transport Select Committee has issued a report stating that the current short-term approach to financing road maintenan
  • £317 million UK highway project delayed
    February 12, 2025
    A £317 million UK highway project is delayed.
  • Kenya highway link upgrade planned
    June 19, 2017
    Plans are moving forward with regard to the upgrade work to the highway connecting Kenya’s capital Nairobi with the port of Mombasa.