Skip to main content

South Eastern Nigerian road project stalls

Construction work on the upgrade of the road connecting Calabar with Itu and Ikot Ekpene in South East Nigeria has once again ground to a halt. The contractor carrying out the work, Julius Berger, has transferred personnel and equipment to other projects. This action has been taken due to a delay in payments for the work to the contractor. The road is now in extremely poor condition, which is a key problem for transport between Cross River State and Akwa Ibom State. Much of the road is now said to be virt
July 24, 2019 Read time: 2 mins

Construction work on the upgrade of the road connecting Calabar with Itu and Ikot Ekpene in South East Nigeria has once again ground to a halt. The contractor carrying out the work, Julius Berger, has transferred personnel and equipment to other projects. This action has been taken due to a delay in payments for the work to the contractor.

The road is now in extremely poor condition, which is a key problem for transport between Cross River State and Akwa Ibom State. Much of the road is now said to be virtually impassable, with heavy vehicles having to take a much longer route to the north via Umauhia. Light vehicles such as cars and motorcycles are still able to use the many dirt roads criss-crossing the area, although journey times are longer and safety and capacity are key concerns.

That Calabar, one of Nigeria’s important cities, is suffering such poor transport connections as a result is a major problem for the economy of Cross River State in particular and the south east of the country in general.

The two lane road was surfaced in the 1970s and then patched up periodically, with the route becoming progressively more dilapidated. The project to widen the route to a dual carriageway was one of several put forward by president Buhari in the run up to his election for his second period in office.

Related Content

  • Budgeting for Vietnam’s North-South Expressway project
    October 25, 2022
    Vietnam is budgeting for its North-South Expressway project.
  • Egypt’s new concrete highway connecting Cairo with Suez
    July 15, 2016
    CEMEX has played a key role in a highway construction job in Egypt. The company has supplied 130,000m3 of concrete that has been used for the construction of the new Cairo–Suez highway project. The project is of note as this is Egypt’s first concrete highway and if it proves successful, more are likely to be built using this construction method. The 35km road is of major importance to Egypt also as it connects the capital, Cairo, with the seaport city of Suez, two of the nation’s most important economic cen
  • Cutting congestion in LA?
    June 4, 2019
    A new proposal has been put forward for Los Angeles suggesting that a congestion charging scheme be introduced to help tackle the city’s transport woes. According to the CEO of the Los Angeles Metro system, the revenue from the congestion charge for drivers could then be used to allow people to use the city’s transit system for free. Many US cities depend heavily on road transport for carrying goods and commuting. However as many inhabitants and visitors to Los Angeles can attest, the sprawling city and it
  • CECE Summit – is Europe ready for a digital construction worksite?
    November 20, 2015
    The CECE has voiced his concern over government regulations that could strangle innovation for the digitalisation of construction machinery. China’s imploding economy was another topic at the recent conference in Brussels, reports David Arminas. The CECE has urged the European Parliament and European Commission to enact legislation that promotes rather than hinders the construction sector’s transition to a digitalised way of working. “We need a smart regulatory framework that helps to unlock the full poten