Skip to main content

South Eastern Nigerian road project stalls

Construction work on the upgrade of the road connecting Calabar with Itu and Ikot Ekpene in South East Nigeria has once again ground to a halt. The contractor carrying out the work, Julius Berger, has transferred personnel and equipment to other projects. This action has been taken due to a delay in payments for the work to the contractor. The road is now in extremely poor condition, which is a key problem for transport between Cross River State and Akwa Ibom State. Much of the road is now said to be virt
July 24, 2019 Read time: 2 mins

Construction work on the upgrade of the road connecting Calabar with Itu and Ikot Ekpene in South East Nigeria has once again ground to a halt. The contractor carrying out the work, Julius Berger, has transferred personnel and equipment to other projects. This action has been taken due to a delay in payments for the work to the contractor.

The road is now in extremely poor condition, which is a key problem for transport between Cross River State and Akwa Ibom State. Much of the road is now said to be virtually impassable, with heavy vehicles having to take a much longer route to the north via Umauhia. Light vehicles such as cars and motorcycles are still able to use the many dirt roads criss-crossing the area, although journey times are longer and safety and capacity are key concerns.

That Calabar, one of Nigeria’s important cities, is suffering such poor transport connections as a result is a major problem for the economy of Cross River State in particular and the south east of the country in general.

The two lane road was surfaced in the 1970s and then patched up periodically, with the route becoming progressively more dilapidated. The project to widen the route to a dual carriageway was one of several put forward by president Buhari in the run up to his election for his second period in office.

Related Content

  • New Silvertown Tunnel under River Thames in London
    May 11, 2018
    Transport for London (TfL) has been granted a Development Consent Order (DCO) by the Department for Transport (DfT) for the Silvertown Tunnel. This new twin-bore road tunnel will run under the River Thames in East London. The DCO is the formal process giving the green light to any development categorised as a Nationally Significant Infrastructure Project (NSIP). The tunnel is set to open in 2023 and is intended to help reduce the chronic congestion at the existing Blackwall Tunnel. The project will also he
  • Nigerian road upgrade projects being planned
    October 2, 2019
    Two major road upgrade projects are being planned in Nigeria.
  • Germany tunnel and bridge projects being discussed
    February 27, 2018
    Projects to improve historic tunnel and bridge links are now progressing in Germany after some delays. These are for the refurbishment of the old Elbe Tunnel in Hamburg and a bridge upgrade in Cologne. Stretching some 426m, the Old Elbe Tunnel runs from the St Pauli area on the north of the River Elbe to the port area in the south. Opened in 1911 the twin tube tunnel is of historic value, even though its importance for vehicle traffic is now comparatively minor following the opening of a new road tunnel in
  • Develop the Silk Roads, boost economic growth
    April 12, 2012
    Tony Pearce, honorary life member and former director-general of IRF Geneva, recalls the history of the Silk Roads, highlights their continued economic relevance and introduces IRF's active long-term commitment to their rehabilitation.