Skip to main content

South Eastern Nigerian road project stalls

Construction work on the upgrade of the road connecting Calabar with Itu and Ikot Ekpene in South East Nigeria has once again ground to a halt. The contractor carrying out the work, Julius Berger, has transferred personnel and equipment to other projects. This action has been taken due to a delay in payments for the work to the contractor. The road is now in extremely poor condition, which is a key problem for transport between Cross River State and Akwa Ibom State. Much of the road is now said to be virt
July 24, 2019 Read time: 2 mins

Construction work on the upgrade of the road connecting Calabar with Itu and Ikot Ekpene in South East Nigeria has once again ground to a halt. The contractor carrying out the work, Julius Berger, has transferred personnel and equipment to other projects. This action has been taken due to a delay in payments for the work to the contractor.

The road is now in extremely poor condition, which is a key problem for transport between Cross River State and Akwa Ibom State. Much of the road is now said to be virtually impassable, with heavy vehicles having to take a much longer route to the north via Umauhia. Light vehicles such as cars and motorcycles are still able to use the many dirt roads criss-crossing the area, although journey times are longer and safety and capacity are key concerns.

That Calabar, one of Nigeria’s important cities, is suffering such poor transport connections as a result is a major problem for the economy of Cross River State in particular and the south east of the country in general.

The two lane road was surfaced in the 1970s and then patched up periodically, with the route becoming progressively more dilapidated. The project to widen the route to a dual carriageway was one of several put forward by president Buhari in the run up to his election for his second period in office.

Related Content

  • Rubber recycling for South African roads
    November 5, 2012
    South Africa takes crumb rubber use to the next level - *Anders Marschall Jensen The preservation of the environment is a global concept, and in the road construction industry, it is all about preservation of roads. In earlier days, roads were built with the primary goal of moving passenger traffic from one place to another, but these days, roads are very different. Not only is there passenger traffic, and more of it, but roads must also deal with extensive movement of products in heavy vehicles. Therefore,
  • New Zealand motorway link approved
    December 1, 2017
    A key approval stage has been reached for New Zealand’s Northern Corridor Improvement project. The proposed work involves building a high capacity connection between Manukau and Albany, with a board of inquiry giving its go ahead for construction. The project has been put forward by the New Zealand Transport Agency (NZTA), with construction now expected to commence in the second quarter of 2018 and likely to take 40 months to complete. A key aspect of the project will be widening the bridge that crosses
  • Eyes on the road – the distraction problem
    June 23, 2016
    The news that Europe’s road safety drive stalled in 2015 is a cause for concern. The actual causes of this stutter in the road with regard to boosting safety have yet to be identified. But it is highly likely that driver distraction plays a role, at least in part. There is plenty of research showing just how much of a risk the use of cellphones pose for drivers. And yet far too many drivers are blasé about the risks these pose for driver distraction. The sight of someone using a cellphone at the wheel i
  • $594 million Chilean highway delayed
    May 6, 2025
    Bidding for a $594 million Chilean highway is delayed.