Skip to main content

South Eastern Nigerian road project stalls

Construction work on the upgrade of the road connecting Calabar with Itu and Ikot Ekpene in South East Nigeria has once again ground to a halt. The contractor carrying out the work, Julius Berger, has transferred personnel and equipment to other projects. This action has been taken due to a delay in payments for the work to the contractor. The road is now in extremely poor condition, which is a key problem for transport between Cross River State and Akwa Ibom State. Much of the road is now said to be virt
July 24, 2019 Read time: 2 mins

Construction work on the upgrade of the road connecting Calabar with Itu and Ikot Ekpene in South East Nigeria has once again ground to a halt. The contractor carrying out the work, Julius Berger, has transferred personnel and equipment to other projects. This action has been taken due to a delay in payments for the work to the contractor.

The road is now in extremely poor condition, which is a key problem for transport between Cross River State and Akwa Ibom State. Much of the road is now said to be virtually impassable, with heavy vehicles having to take a much longer route to the north via Umauhia. Light vehicles such as cars and motorcycles are still able to use the many dirt roads criss-crossing the area, although journey times are longer and safety and capacity are key concerns.

That Calabar, one of Nigeria’s important cities, is suffering such poor transport connections as a result is a major problem for the economy of Cross River State in particular and the south east of the country in general.

The two lane road was surfaced in the 1970s and then patched up periodically, with the route becoming progressively more dilapidated. The project to widen the route to a dual carriageway was one of several put forward by president Buhari in the run up to his election for his second period in office.

Related Content

  • Bridge under discussion for UK's Thames River
    March 22, 2012
    Engineering specialist AECOM will carry out a study into the proposed Lower Thames Crossing project in the UK.
  • Tunnel project for south German town to restart
    August 5, 2019
    Construction work is to restart on a new tunnel project in the South German town of Garmisch-Partenkirchen following the necessary approvals having been received. The town lies to the south of Munich and is a popular winter ski resort, while in summer it also experiences heavy tourist traffic as it lies on a key route between Germany and Austria, as well as Italy, lying to the south. The busy Autobahn 95 connects Munich’s southern side with Garmisch-Partenkirchen. But this route ends just to the northern si
  • Nigeria key connection from Lagos to Ibadan
    November 28, 2016
    Work on one of Nigeria’s busiest highways, the A5 route connecting Lagos with Ibadan, is close to completion. Lagos and Ibadan are two of the largest cities in Nigeria and as the distance between the two is comparatively short at 128km, the highway carries heavy traffic. The tender process for the project was won by Julius Berger Nigeria in 2013, with the work being handled in two sections from Lagos to the Sagamu Interchange and from the Sagamu Interchange to Ibadan. Work on the project was halted temporar
  • Skidmarks: Hot Sauce
    February 25, 2020
    Our Skidmarks page is highly rated by readers. Your input could help make this page even more entertaining. If you come across any amusing road-related stories or pictures email me at [email protected]