Skip to main content

Russia redeveloping roads in Krasnodar and Crimea

Russia is setting out plans to redevelop road links in the Krasnodar Region and Crimea Region.
By MJ Woof May 19, 2020 Read time: 1 min
Russia’s road plans for the Krasondar and Crimean regions – image © courtesy of Mohamed Osama, Dreamstime.com

Russia is planning major road improvements and upgrades for the Krasnodar Region and neighbouring Crimea Region.

In the Krasnodar Region over 681km of roads will be upgraded and improved. The work is expected to cost US$253.7 million, with the work due for completion by 2024. So far, the Krasnodar Region has already improved 2,488km of roads in the 2015-2019 period.

The Federal Road Agency will channel $102 million for works to upgrade roads in the annexed Crimea Region. The aim is to improve 166km of road links. Many of Crimea’s roads are in a poor state and the region’s economy has been depressed, with the previous conflict having been a factor.

Related Content

  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • Controversial Russian bridge opens
    May 16, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link opening to use by cars. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Kamaz truck to reach the city of Kerch. The US$2.7 billion bridge forms part of
  • Road works in Krasnodar, Russia
    August 18, 2020
    Road works are being planned in Krasnodar, Russia.
  • Revamp for Russian route connecting to Crimea crossing
    October 19, 2018
    A major road revamp project is being planned in Russia. The approach routes to the new bridge connecting with Crimea will be improved, boosting capacity, safety and traffic flow. The project will run as part of a series of transport upgrades in the Krasnodar Region, running until 2024 and worth a total of US$1.3 billion. A 136km stretch of the 150km stretch of highway between Krasnodar and Temryuk will be improved, in a bid to meet the anticipated jump in traffic from around 10,000-20,000 vehicles/day at