Skip to main content

Route 54 Næstved-Rønnede upgrade coming

The motorway project on the Danish island of Zealand could entail upgrading the two-lane Route 54 and will likely start in 2026.
By David Arminas March 19, 2024 Read time: 2 mins
The current route 54 is basically a country road with cycle paths on both sides (image © Gestur Gislason/Dreamstime)

The Danish Road Directorate has announced that more than €200.2 million has been allocated for construction of a motorway between Næstved and Rønnede.

The project on the island of Zealand could entail upgrading the two-lane Route 54 and will likely start in 2026.

But planning and designs will have to take account of two Natura 2000 areas sites located close to the project site. Natura 2000 is a network of nature protection and conservations areas within the European Union and includes both terrestrial and marine locations.

Næstved is a town of around 45,000 people in the southern part of Zealand. Rønnede, around 19km away, has a population of about 3,000, but it lies close to European route E47 that connects Lübeck in Germany to Helsingborg in Sweden via the Danish capital Copenhagen.

The current route 54 is basically a country road with cycle paths on both sides. There is a general speed limit of 80km/h, but there are also local speed limits of 60-70km/h.

Upgrades and re-alignments have been considered over the past decade and a previously completed environmental assessment will have to be updated before work can start, according to media reports.

A recent town hall meeting held by Danish Road Directorate showed residents of the area are concerned about noise and animal-vehicles crashes. Animal underpasses and noise barriers will be considered in future planning, the directorate noted.

Several properties have already been acquired and up to 25 more might need to be expropriated.

For more information on companies in this article

Related Content

  • Sand, gravel and asphalt, building Poland’s roads
    February 24, 2012
    A new quarry is producing top quality aggregates for Poland's massive road construction programme writes Claire Symes. Wakoz Beton's Glazica sand quarry in Poland is a major source of high quality sand and gravels for the Gdansk construction market. The site is modern and only opened in 2006 but Wakoz Beton has continued to invest in facilities to improve its efficiency and output quality. The installation of a CDE mobile washing plant at the site last year is allowing it to provide materials for concrete.
  • Construction of Fehmarn Belt Link could start in 2019
    February 27, 2018
    Construction of a Fehmarn Belt Link could start a year from now – more than a year ahead of schedule, according to Danish media reports. The timing was put forward by Holger Schou Rasmussen, chairman of Femernbælt Development, and Kristian Pihl Lorenzen, the Liberal Party spokesman for traffic issues. They reportedly said that a pending environmental court case in Germany that has stalled approval by German authorities won’t hold up construction of the 18km crossing as much as had been feared. As late as
  • Auckland’s causeway project
    April 4, 2014
    When it is finished in early 2017, the causeway on Auckland’s North-western Motorway, State Highway 16, will have been raised 1.5m to stop flooding at extreme high tides. There will be four lanes city-bound and four/five lanes westbound with dedicated bus lanes in each direction, and the existing North-western cycleway that runs alongside it will be upgraded.
  • Consortium constructing challenging route in Chilean capital Santiago?
    January 29, 2014
    The concession package for the US$1.06 billion Américo Vespucio Oriente (AVO) expressway in Santiago, Chile looks set to be awarded to a consortium headed by OHL Concesiones Chile. OHL's proposal of a subsidy close to 20% of the project's cost beat Spanish group Cintra's bid, according to a report from Business News Americas. Of 15 companies that prequalified for the project, only OHL in an alliance with Sacyr Concesiones Chile and Cintra had submitted technical offers for the 40-year concession. Constructi