Skip to main content

Route 54 Næstved-Rønnede upgrade coming

The motorway project on the Danish island of Zealand could entail upgrading the two-lane Route 54 and will likely start in 2026.
By David Arminas March 19, 2024 Read time: 2 mins
The current route 54 is basically a country road with cycle paths on both sides (image © Gestur Gislason/Dreamstime)

The Danish Road Directorate has announced that more than €200.2 million has been allocated for construction of a motorway between Næstved and Rønnede.

The project on the island of Zealand could entail upgrading the two-lane Route 54 and will likely start in 2026.

But planning and designs will have to take account of two Natura 2000 areas sites located close to the project site. Natura 2000 is a network of nature protection and conservations areas within the European Union and includes both terrestrial and marine locations.

Næstved is a town of around 45,000 people in the southern part of Zealand. Rønnede, around 19km away, has a population of about 3,000, but it lies close to European route E47 that connects Lübeck in Germany to Helsingborg in Sweden via the Danish capital Copenhagen.

The current route 54 is basically a country road with cycle paths on both sides. There is a general speed limit of 80km/h, but there are also local speed limits of 60-70km/h.

Upgrades and re-alignments have been considered over the past decade and a previously completed environmental assessment will have to be updated before work can start, according to media reports.

A recent town hall meeting held by Danish Road Directorate showed residents of the area are concerned about noise and animal-vehicles crashes. Animal underpasses and noise barriers will be considered in future planning, the directorate noted.

Several properties have already been acquired and up to 25 more might need to be expropriated.

For more information on companies in this article

Related Content

  • Fehmarn Belt Fixed Link could open by 2025 at earliest
    November 27, 2015
    The ambitious Fehmarn Belt Fixed Link, connecting Denmark and Germany, will open in 2025 at the earliest, according to the Danish finance ministry. Femern A/S, the Danish government-owned company managing the project, confirmed the note from the government. It also said the ministry still has financial concerns over the deal to build an immersed tunnel connecting the towns of Rødby in Denmark’s southern Zealand with Puttgarden in northern Germany. Of particular is the time for a construction company t
  • Denmark concerned over rising cost of Fehmarn Belt Fixed Link
    February 19, 2015
    The Danish government is in talks with contractors over the latest rise in cost estimates for the proposed prestigious Fehmarn Belt Fixed Link between Denmark and Germany. Contractors have estimated an extra €295.5 million will be needed. This is in addition to a statement last November by the contracting company Femern saying that costs had risen nearly €900 million. The total rise price hike is nearly €1.2 billion. This puts the final cost of the 18km tunnel including two railway tunnels, two motorway tun
  • Fehmarnbelt hearings to start
    September 24, 2020
    The Danish-German project has come under financial and environmental criticism.
  • Denmark eyes Little Belt Fixed Link
    November 8, 2023
    The directorate is concerned that the so-called New Little Bridge, which opened in 1970, will suffer severe traffic congestion from 2030 onwards.