Skip to main content

Road repair required on Mexico route

Major road repairs are now required on a busy highway route in Mexico. The Cuernavaca bypass in Morelos State now features a large sinkhole, a mere 300m from the location of another sinkhole that opened up in mid-2017. The Paso Expres bypass cost US$104.4 million and was constructed by the contractors Aldesa and Epcor. The previous sinkhole opening resulted in two fatalities. The project has been criticised for inadequacies with regard to the drainage installed during construction.
June 18, 2018 Read time: 1 min

Major road repairs are now required on a busy highway route in Mexico. The Cuernavaca bypass in Morelos State now features a large sinkhole, a mere 300m from the location of another sinkhole that opened up in mid-2017. The Paso Expres bypass cost US$104.4 million and was constructed by the contractors Aldesa and Epcor. The previous sinkhole opening resulted in two fatalities. The project has been criticised for inadequacies with regard to the drainage installed during construction.

Related Content

  • Road repairs and cost increases in Australia
    March 13, 2023
    Road repairs and cost increases for projects are being seen in Australia.
  • New Central Ring Road around Moscow to be built by 2018
    September 30, 2013
    Eugene Gerden evaluates Moscow’s new ring road mega project The Russian government plans to complete implementation of one of the most ambitious projects in the country’s road building industry in recent years, which involves construction of The Central Ring Road around Moscow by 2018. The new road should be built by the next presidential elections, while its length will be 339km. It is expected to be comprised of five sections and will be located 50km away from Moscow Ring Road, a ring road encircling the
  • BC again eyes Massey Tunnel replacement
    December 21, 2020
    The aging 61-year-old Canadian tunnel is about 30km north of the US state of Washington.
  • Mexico City’s new tunnel link being comnpleted
    July 14, 2017
    A new twin tube tunnel in Mexico City will help reduce the city’s chronic congestion problem, which is particularly acute at peak travel periods. The tunnel is located at Mixcoac in the south west of the city and should be ready by August 2017. The new twin bore tunnel link will reduce traffic jams on the city’s Circuito Interior urban highway, which handles up to 300,000 vehicles/hour at peak travel periods. Mexico City’s traffic jams are notorious and journey times can be infuriatingly long at times.