Skip to main content

Repairing utilities quickly with new tool

A new tool offers the chance to speed repairs to utilities, reducing disturbance to drivers and pedestrians alike in busy urban areas. The conventional way to break into an existing cast iron main has been to expose it from the surface in a pit and then hit it hard with something until it breaks. However, this is no longer considered either safe or efficient. Instead, Utility Innovation Solutions (UIS) has delivered a more effective tool, the Click Stick.
April 4, 2017 Read time: 2 mins
The Click Stick device can make breaking iron utilities pipes a quicker and more efficient task
A new tool offers the chance to speed repairs to utilities, reducing disturbance to drivers and pedestrians alike in busy urban areas.

The conventional way to break into an existing cast iron main has been to expose it from the surface in a pit and then hit it hard with something until it breaks. However, this is no longer considered either safe or efficient. Instead, Utility Innovation Solutions (UIS) has delivered a more effective tool, the Click Stick.

UIS has designed the Click Stick for breaking into cast iron mains pipes safely without the need for brute force from the site crew. This manually operated tool is quick and easy to use. Once the pipe to be accessed is exposed, the lightweight Click Stick is manually lowered into the excavation and using its C-section construction is positioned around the pipe.

There is a guide/location arrow to show where the centre of the unit should be placed in relation to the pipe to ensure the breaking action is applied to best advantage. When in the right position, the operator activates the battery powered hydraulic pump, which engages a vertical ram to grip the pipe. As the force on the ram is increased the pipe breaks in a controlled and safe way with the operator at a safe distance from the fracture when it occurs.

The unit has been extensively tested during its development and is now being introduced with a number of key rental and utilities firms in the UK amongst repair crews.

Related Content

  • Better drainage planning with QuAD software
    April 19, 2021
    The QuAD software resilience tool from ACO Water Management allows users to test the efficiency of a proposed maintenance regime for a roadway water channel design.
  • Paving a Japanese airport within strict time constraints
    September 19, 2012
    In Japan, major efforts are being made to both conserve energy and materials, while also delivering high quality airport runways. At Haneda Airport, as well as at the Fukuoka, Chitose and Sendai airports, innovative use is being made of asphalt paving equipment from Sumitomo. The latest model HA60W J paver from Sumitomo is being used to lay warm mix asphalt, while the contractors is also using sophisticated control technology. To minimise disruption to flight schedules, construction work at Haneda has been
  • Airport preparation through compaction
    April 12, 2018
    Two major airport projects around the world are being constructed on poor ground and have required extensive compaction - Mike Woof writes With air travel continuing to increase around the world, airport capacity is being upgraded in many major cities. Two of the world’s largest mega cities, Beijing and Istanbul, are constructing new airports to cope with growing demand. This is because the existing facilities are simply unable to cope with projected growth for aviation and some of the airports are alrea