Skip to main content

Repairing utilities quickly with new tool

A new tool offers the chance to speed repairs to utilities, reducing disturbance to drivers and pedestrians alike in busy urban areas. The conventional way to break into an existing cast iron main has been to expose it from the surface in a pit and then hit it hard with something until it breaks. However, this is no longer considered either safe or efficient. Instead, Utility Innovation Solutions (UIS) has delivered a more effective tool, the Click Stick.
April 4, 2017 Read time: 2 mins
The Click Stick device can make breaking iron utilities pipes a quicker and more efficient task
A new tool offers the chance to speed repairs to utilities, reducing disturbance to drivers and pedestrians alike in busy urban areas.

The conventional way to break into an existing cast iron main has been to expose it from the surface in a pit and then hit it hard with something until it breaks. However, this is no longer considered either safe or efficient. Instead, Utility Innovation Solutions (UIS) has delivered a more effective tool, the Click Stick.

UIS has designed the Click Stick for breaking into cast iron mains pipes safely without the need for brute force from the site crew. This manually operated tool is quick and easy to use. Once the pipe to be accessed is exposed, the lightweight Click Stick is manually lowered into the excavation and using its C-section construction is positioned around the pipe.

There is a guide/location arrow to show where the centre of the unit should be placed in relation to the pipe to ensure the breaking action is applied to best advantage. When in the right position, the operator activates the battery powered hydraulic pump, which engages a vertical ram to grip the pipe. As the force on the ram is increased the pipe breaks in a controlled and safe way with the operator at a safe distance from the fracture when it occurs.

The unit has been extensively tested during its development and is now being introduced with a number of key rental and utilities firms in the UK amongst repair crews.

Related Content

  • Increased performance from hand-operated compaction machines
    March 14, 2012
    Compact compaction units are delivering increased performance – Mike Woof reports. Competition is tough in the market for non-ride-on compaction units, with two manufacturers now introducing revamped models. Both JCB and Wacker Neuson aim to claim a larger section of the market with their latest designs, compaction plates and remote-controlled trench rollers respectively.
  • Compact machines deliver more - for less
    February 14, 2012
    The mini and midi excavator sector continues to squeeze more out of less, with some innovative engineering solutions being applied to zero- and short-tailswing models - Geoff Ashcroft investigates. It is a vicious circle - customers seek smaller, tighter, ever more compact excavators, leaving manufacturers with the challenges of squeezing greater levels of technology into what is all too often an even smaller machine.
  • The use of concrete cutting tools and tips for users
    October 8, 2015
    Despite the proven importance of identifying metal targets and electrical lines before cutting into concrete, every day there are stories about mishaps that happen when the necessary reconnaissance is not done. In this article, a few firms that provide concrete scanning services weigh in on the critical importance of locating embedded and or buried obstructions by scanning for these features using ground penetrating radar (GPR). Also offered are tips for selecting the best GPR equipment and best practices f
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk