Skip to main content

Norway’s tunnels face safety concerns

Many of Norway’s road tunnels face safety concerns.
By MJ Woof December 30, 2020 Read time: 1 min
A large number of Norway’s road tunnels do not meet current European safety requirements – image courtesy of © Sjankauskas, Dreamstime.com

A number of road tunnels in Norway face safety concerns. An evaluation of the country’s network has shown that 68 tunnels forming part of the European road system do not meet current European safety requirements.

Upgrading these tunnels so that they meet safety requirement has been described as highly necessary by the European Free Trade Associations surveillance body, ESA. According to the ESA, the Norwegian Government has to prioritise the improvement works.

The road tunnel improvement programme is already underway, but the upgrade work will take several years to complete.

Related Content

  • Oslofjord Tunnel closed for repairs for up to three weeks
    May 12, 2017
    The 7km subsea Oslofjord Tunnel in Norway will be closed for up to three weeks after a truck caught fire in the tunnel on May 5. Norwegian media report that a 500m stretch was damaged - tunnel vault, cables, insulation and road surface. The tunnel is equipped with 25 evacuation rooms that can be sealed off from the main tunnel. Each room can provide pressurised space for up to 50 people while a fire is being fought. However, the latest incident has spurred the government to announce that a second tube will
  • Motorcycle type approval deal for Europe
    November 29, 2012
    The Members of the European Parliament have now approved the regulation on the approval of two- and three wheelers. This included a number of amendments which have been welcomed by motorcyclists as a compromise. The regulation is setting new rules and technical requirements for manufacturers who sell motorcycles in the European Union. The new rules were intended to improve safety for motorcyclists but in the original form, these would have been expensive to implement and would have resulted in substantial c
  • Norway’s fire-damaged Skatestraum tunnel to remain closed until 2016
    August 20, 2015
    Repair costs for the fire-ravaged undersea Skatestraum tunnel in Bremanger have risen to nearly US$4.7 million, according to Norwegian media reports. Repairs will run into next year when the tunnel, on Norway’s southern North Sea coast, will re-open, although no date was given, the Norwegian media outlet E24 said. The tunnel, nearly 2km long, was opened only in 2002 at a cost of nearly $39 million. No one was injured in the accident when the tunnel was severely damaged by fire on July 15. A tanker
  • Black sea countries complete preparations for implementation of Black Sea Ring project
    August 23, 2016
    The Black Sea Ring Road project will improve transport connections for the region - Eugene Gerden writes. Russia has officially started implementation of a project, known as the Black Sea Ring Road, which involves building a four-lane highway system connecting the countries surrounding the Black Sea. The Black Sea Ring Road is a substantial project, a highway measuring some 7,140km in all. Among the countries participating in the project are Turkey, Georgia, Russia, Ukraine, Moldova, Romania, Greece and