Skip to main content

Money lacking for Széchenyi Bridge renovation

Money problems for renovation of Budapest's Chain Bridge
By David Arminas February 10, 2020 Read time: 2 mins
Budapest's Chain Bridge (photo © Jan Drholec Dreamstime)

Long-awaited major renovations to Budapest’s historic Széchenyi Chain Bridge and nearby road tunnel have been shelved due to cost concerns,  according to Hungarian media.

Upgrading has been at least two-years in the planning to improve the 380m-long, 14.8m-wide suspension bridge that was built between 1839 and 1849. Bids had been submitted but Budapest City Council said it had secured only around €72 million – not even enough to pay for the bridge work alone.

When opened in 1849, it was the first permanent bridge over the Danube River that connected the opposite towns of Buda and Pest – now the Hungarian capital. At the time, its centre span of 202m was one of the longest in the world. The bridge has the official name of István Széchenyi, a major supporter of its construction, although it is commonly called the Chain Bridge.

The bridge's cast-iron structure was updated and strengthened in 1914. During World War II, the bridge was blown up by the retreating Germans in January 1945. Only the towers remained standing but the bridge was reopened after extensive reconstruction in 1949.

The Széchenyi Chain Bridge is one of only two surviving bridges designed by English engineer William Tierney Clark. The other is a suspension bridge in England over the River Thames at the town of Marlow, up-river from London.

Related Content

  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.
  • Canadian PM Trudeau warned of costs rises for Gordie Howe Bridge
    January 11, 2016
    A devaluing Canadian dollar has pushed up the cost for building a signature Windsor-Detroit bridge by around US$2.5 billion, according to Canadian media reports. The increase more than doubles what was believed needed by the Canadian government to construct the Gordie Howe Bridge, named after a Canadian ice hockey player who played most of his career for the Detroit Red Wings. The toll bridge, to be built under a public private partnership, will link the US city of Detroit, in the state of Michigan, w
  • THG Verk starts Ölfusá Bridge work
    December 9, 2024
    THG Verk - in Icelandic, ÞG Verk – is the main contractor for the 330m-long cable-stayed bridge that will cross the Ölfusá River, Iceland’s biggest.
  • Romania’s important bridge project
    October 5, 2022
    Romania’s important Braila Bridge project will deliver a key crossing spanning the Danube River