Skip to main content

Latvia: money for road maintenance

Money coming to keep road projects going.
By David Arminas June 1, 2020 Read time: 1 min
Money for Latvia’s gravel roads (photo © Martins Vanags/Dreamstime)

Latvia has spent more than €21 million on daily road maintenance so far in 2020, according to Latvijas Autocelu Uzturetajs, the state highway maintenance authority.

Juris Aksels Cirulis, head of LAU, said that surface maintenance of state roads accounted for almost €10.5 million while repairs of potholes totaled €1.4 million. The government also spent nearly €2 million on gravel road grading.

A total of 4,226 road traffic signs and more than 2,900 traffic signals were installed or repaired along state roads. Almost 1.2km or safety barriers were repaired.

In April, the government said it would spend an additional €75 million to get stalled road projects back on track.

Related Content

  • Russian relief road project for Moscow
    May 3, 2019
    A new relief road project is going ahead in Russia’s capital, Moscow. The four lane relief road for the Ostafievskoe Highway in Moscow is due for completion in 2020. The 3.75km link will feature crosswalks, traffic lights and intersections and a 200m bridge section. Noise barriers will be installed along 1.2km of the route.
  • Karpaty Tunnel value-for-money scrutinised
    May 19, 2023
    The planned 12km Karpaty Tunnel under the Lesser Carpathian mounts of Slovakia is again being questioned as the government awaits an environmental impact assessment.
  • Kosovo's award-winning green highway construction
    March 20, 2012
    A new highway is proving an economic lifeline for the tiny country of Kosovo – Mike Woof reports. Road projects in Europe rarely meet such widespread public approval and support as the new Route 7 highway being built in the new Balkan state of Kosovo. The first sections of the new road opened to traffic in November 2011, with locals turning out in large numbers to celebrate the event. The official opening was carried out by the country’s prime minister Hashim Thaçi, president Atifete Jahjaga, and members of
  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained