Skip to main content

LA’s Ribbon of Light viaduct cast into darkness

Thieves have been pulling copper wiring out of electrical boxes Los Angeles’ 6th Street Viaduct and selling it for scrap, prompting police to report that “the Grinch stole all the Christmas lights”.
By David Arminas January 10, 2024 Read time: 3 mins
LA’s 6th Street Viaduct in brighter times (image courtesy HNTB)

Thieves have been stealing copper wire from the lighting system of LA’s 6th Street Viaduct, casting sections of the steel and concrete structure into darkness.

The award-winning 1.1km long and 14m wide bridge spanning Los Angeles’ historic Boyle Heights opened in July 2022 as a replacement for a 1932 bridge. It features 10 pairs of 9.1m and 18.2m concrete canted arches that are illuminated with different colours. The four-lane viaduct has wide pedestrian paths on both sides.

Since its opening, the bridge – the longest in Los Angeles City - has become the backdrop for thousands of people who pose or play on the structure for their social media sites, according to a report in the Los Angeles Daily News newspaper. This included drivers who would take over the bridge to perform illegal maneuvers.

Thieves have pulled the copper wiring out of dozens of electrical boxes and it for scrap, prompting local police to report that “The Grinch stole all the Christmas lights”, the newspaper said. However, the problem of thieves stealing copper wiring from many infrastructure projects across the US at all times of year is unfortunately common.

The newspaper noted that for the opening of the bridge in 2022 – after six years of construction - thousands of locals came out to celebrate on the structure noted for its unusual arch design. The bridge has had been

But police have had to periodically close the bridge because of drivers doing stunts, people climbing on the arch loops and skateboarders riding them like ramps. There was even a barber cutting a client’s hair in the middle of traffic, said the newspaper. Last May, a 17-year-old slipped to his death while attempting to scale part of the bridge.

The earlier viaduct on this site, built in 1932, was closed for demolition in January 2016 and demolished due to serious structural issues, including several large cracks, resulting from the high alkaline content of the concrete composition, due to architectural unsophistication. As a result, concerns over the structure's seismic instability outweighed its historical status, leading to its closure.

The new bridge spans the LA River and the 101 Freeway, local surface roads as well as 18 railroad tracks operated by five different railroad agencies including Union Pacific and Metrolink. It was designed by the HNTB which led an international competition decided by public vote. The viaduct accommodates vehicles and pedestrians, as did the original bridge, and provides dedicated lanes for bikes.

The overall project included a 12-acre public park running below the bridge, accessible by multiple stairways and a helical bike ramp which also lead to recreational fields with restrooms and café, the LA River, public art and an arts plaza.

HNTB says that it is the largest bridge project in the history of the City of Los Angeles and winner of  American Council of Engineering Companies' 2023 Grand Conceptor Award.

For more information on companies in this article

Related Content

  • Canada, US officials soon to settle planned Detroit bridge issue
    February 5, 2015
    An end to a thorny issue is close at hand concerning who will fund construction of a border customs plaza on the US side of a planned bridge linking Canada and the United States. US President Barack Obama’s US$4-trillion budget did not set aside any money for the plaza for a second consecutive year, further irritating Canadian officials who are overseeing construction of the bridge. It appears that the Canadian government might end up footing the entire bill, according to a report in Toronto’s Globe a
  • Lázár defends Mohács Danube bridge
    January 21, 2025
    A public tender was won last year by Duna Aszfalt and the design for the controversial 750m-long three-arch structure in Hungary has been done by Hungarian civil engineering firm SpecialTerv.
  • Hoover Dam’s innovative new bridge bypass
    April 12, 2013
    Soaring over 271m above the Colorado River, the Hoover Dam Bypass overlooks one of America’s greatest icons and assets. The October 2010 opening of the bypass improves the security of the historic Hoover Dam by removing through traffic from US Route 93. This has reduced its vulnerability to a terrorist attack against an international landmark and guarded the most sustainable source of electricity and the scarce water supply for the entire southwestern United States. By diverting traffic from the hairpin tur
  • Young Driver Risk
    April 16, 2018
    Police in the US state of Ohio recently found themselves in a high-speed pursuit involving a vehicle taken without its owner’s consent. The chase lasted for around one hour and the vehicle hit speeds of up to 160km/h during the pursuit, which covered a distance of around 72km in all between Cleveland and Milan. Officers managed to box the car in and bring it to a halt, without anyone being injured. The driver was a 10-year-old boy who took his mother’s car, the second time that the lad had done this in just