Skip to main content

LA’s Ribbon of Light viaduct cast into darkness

Thieves have been pulling copper wiring out of electrical boxes Los Angeles’ 6th Street Viaduct and selling it for scrap, prompting police to report that “the Grinch stole all the Christmas lights”.
By David Arminas January 10, 2024 Read time: 3 mins
LA’s 6th Street Viaduct in brighter times (image courtesy HNTB)

Thieves have been stealing copper wire from the lighting system of LA’s 6th Street Viaduct, casting sections of the steel and concrete structure into darkness.

The award-winning 1.1km long and 14m wide bridge spanning Los Angeles’ historic Boyle Heights opened in July 2022 as a replacement for a 1932 bridge. It features 10 pairs of 9.1m and 18.2m concrete canted arches that are illuminated with different colours. The four-lane viaduct has wide pedestrian paths on both sides.

Since its opening, the bridge – the longest in Los Angeles City - has become the backdrop for thousands of people who pose or play on the structure for their social media sites, according to a report in the Los Angeles Daily News newspaper. This included drivers who would take over the bridge to perform illegal maneuvers.

Thieves have pulled the copper wiring out of dozens of electrical boxes and it for scrap, prompting local police to report that “The Grinch stole all the Christmas lights”, the newspaper said. However, the problem of thieves stealing copper wiring from many infrastructure projects across the US at all times of year is unfortunately common.

The newspaper noted that for the opening of the bridge in 2022 – after six years of construction - thousands of locals came out to celebrate on the structure noted for its unusual arch design. The bridge has had been

But police have had to periodically close the bridge because of drivers doing stunts, people climbing on the arch loops and skateboarders riding them like ramps. There was even a barber cutting a client’s hair in the middle of traffic, said the newspaper. Last May, a 17-year-old slipped to his death while attempting to scale part of the bridge.

The earlier viaduct on this site, built in 1932, was closed for demolition in January 2016 and demolished due to serious structural issues, including several large cracks, resulting from the high alkaline content of the concrete composition, due to architectural unsophistication. As a result, concerns over the structure's seismic instability outweighed its historical status, leading to its closure.

The new bridge spans the LA River and the 101 Freeway, local surface roads as well as 18 railroad tracks operated by five different railroad agencies including Union Pacific and Metrolink. It was designed by the HNTB which led an international competition decided by public vote. The viaduct accommodates vehicles and pedestrians, as did the original bridge, and provides dedicated lanes for bikes.

The overall project included a 12-acre public park running below the bridge, accessible by multiple stairways and a helical bike ramp which also lead to recreational fields with restrooms and café, the LA River, public art and an arts plaza.

HNTB says that it is the largest bridge project in the history of the City of Los Angeles and winner of  American Council of Engineering Companies' 2023 Grand Conceptor Award.

For more information on companies in this article

Related Content

  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • Tasmanian bridge proposal faces controversy
    October 27, 2020
    The design proposal for a new Tasmanian bridge project faces controversy.
  • Q-Free solution for Glasgow
    October 27, 2021
    Q-Free has won a four-year deal to set up its HI-TRAC CMU bicycle detection system including activated warning signs at 16 locations in Glasgow, Scotland.
  • World’s largest bridge deck for KAIA expansion
    December 16, 2013
    A bespoke formwork solution from RMD Kwikform is playing a key role in creating the largest ever airport cast bridge deck as part of the multi-billion dollar expansion of King Abdulaziz International Airport near Jeddah, Saudi Arabia. The firm is also a leading player in the creation of arterial tunnels under the airport’s elevated roads, another key part of the project’s first phase works due for completion in 2014. Guy Woodford reports